Loading...
HomeMy WebLinkAbout2022-02-16FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 2/16/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - The fencing contractor is removing al of thier spoils from - We are digging, detecting, and repairing leaks for the PW line - We are working on the grading on the west side of the v ditch for landscape rock - Work on the level spreaders continues - Grading for fence guy - Work on the chemical vaults continues - We charged the PW- PRW lines and pressure testing continues. 2 Daniel Ford No 20-HEADWORKS AREA - We are piping for the 2 added hose bibs in the Headworks area - The supports for the Foul air are being worked on. 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The 3/4 inch SS lines are being installed for the bypass air - Instal the bolts at the PRW pumps - Work continues for on mounting all the cassette tank and the FRP lids is ongoing - Bolts are being installed everywhere in this area - Anchors and supports for the MBR are being installed 4 Daniel Ford No 60-PRODUCT WATER AREA - Anchors continue to be installed - the 3" Drain pipe at the Calcite tank continues - Globe valves are being installed 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank Work continues for the diffuser install and for the blower piping   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:03 AM PST          MANPOWER LOG 32 Workers  |   265.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 RARIG CONSTRUCTION, INC.4 8.0 32.0 70-RESIDUALS AREA>72-Residuals Area - Dewatering Facility     Notes:Downspouts and trim Created By:  Michael Rarig    2 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Norman Gularte Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Jason Hawthorne Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Micha Pixley Raul Velasquez     FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:03 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    10 Parada Painting Inc.4 10.0 40.0 70-RESIDUALS AREA>72-Residuals Area - Dewatering Facility     Notes:SAFE DEWATERING Created By:  Monica Weiss       32  265.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:03 AM PST        10.  Parada Painting Inc.  2022.02.16 Parada Painting.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:03 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 07:25AM   ASAP 490 Drawings Printed    Comments:Created By: Monica Weiss 2 07:25AM   JB DEWAR, INC 194584 FUEL    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.02.16 ASAP 490.pdf 2.  2022.02.16 JB Dewar 194584.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 41°F 59°F 50°F 0.00 in.0.00 in.0.00 in.38%60%82%38°F 3.6 mph 8 mph 11 mph   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:03 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   42°F Clear   52°F Clear   60°F Clear   58°F Clear   52°F Clear   49°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:45:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:03 AM PST