Loading...
HomeMy WebLinkAbout2022-02-17FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 2/17/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - The fencing contractor is removing al of thier spoils from - We are digging, detecting, and repairing leaks for the PW line - We are working on the grading on the west side of the v ditch for landscape rock - Work on the level spreaders continues - Grading for fence guy - Work on the chemical vaults continues - pressure testing continues. 2 Daniel Ford No 20-HEADWORKS AREA - We are piping for the 2 added hose bibs in the Headworks area - The supports for the Foul air are being worked on. 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The 3/4 inch SS lines are being installed for the bypass air - Instal the bolts at the PRW pumps - Work continues for on mounting all the cassette tank and the FRP lids is ongoing - Bolts are being installed everywhere in this area - Anchors and supports for the MBR are being installed 4 Daniel Ford No 60-PRODUCT WATER AREA - Anchors continue to be installed - the 3" Drain pipe at the Calcite tank continues - Globe valves are being installed 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank Work continues for the diffuser install and for the blower piping   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:03 AM PST          MANPOWER LOG 34 Workers  |   281.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland   2 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Norman Gularte Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Brian Elgin Rick Jenne Orlando Cortez Jason Hawthorne Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Micha Pixley Raul Velasquez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:03 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    10 Parada Painting Inc.4 10.0 40.0 70-RESIDUALS AREA>73-Residuals Area - SAFE Filter System     Notes:Created By:  Monica Weiss      34  281.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    2-17-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:03 AM PST        10.  Parada Painting Inc.  2022.02.17 Parada Painting.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 United Rental 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:03 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 07:35AM   CalPortland Chem Vaults    Comments:Created By: Monica Weiss 2 07:40AM   Capital Flow MR139-A32 Felker Stainless    Comments:AIS Created By: Monica Weiss 3 07:40AM   Ferguson Enterprises, LLC A30 Exp Joint Rods    Comments:Created By: Monica Weiss 4 07:40AM   Ferguson Enterprises, LLC Unisource Exp Joint    Comments:Created By: Monica Weiss 5 07:40AM   HD Supply White Cap 46048061    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.02.17 CalPortland Chem Vaults.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:03 AM PST        2.  2022.02.17 Capflo Felker MR139 A32 AIS.pdf 3.  2022.02.17 Ferguson ExpJt Rings Rods A30.pdf 4.  2022.02.17 Ferguson Unisource MR138 A32 ExpJT.pdf   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:03 AM PST        5.  2022.02.17 White Cap 46048061 A30.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 45°F 60°F 52°F 0.00 in.0.00 in.0.00 in.42%58%68%38°F 4.8 mph 8 mph 13 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   45°F Clear   54°F Clear   60°F Clear   60°F Clear   57°F Clear   51°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 01:55:00 PM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:03 AM PST