HomeMy WebLinkAbout2022-02-22FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 2/22/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Organizing the connexes and the laborers yard - Jobsite clean up - We are working on the grade and subgrade for the road near building 17, 15, 14 and the opps building. - Potholing for the PW line, repairs and testing continue - Backfilling for the PW line continues 2 Daniel Ford No 20-HEADWORKS AREA - We are piping for the 2 added hose bibs in the Headworks area - The supports for the Foul air are being worked on. - The supports for the Hose bibs for the top of the head works is being instaled. 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The 3/4 inch SS lines are being installed for the bypass air - Instal the bolts at the PRW pumps - Work continues for on mounting all the cassette tank and the FRP lids is ongoing - Bolts are being installed everywhere in this area - Anchors and supports for the MBR are being installed 4 Daniel Ford No 60-PRODUCT WATER AREA - We fabricated and installed the 10" Steel Pipe fittings for the IPR tanks - Instruments are being installed at the IPR, Product water tank, and the calcite tank - Anchor supports for the outfall slab are being installed 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Work continues for the diffuser install and for the blower piping (Mostly Bolt up today)   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:04 AM PST          MANPOWER LOG 26 Workers  |   215.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Norman Gularte Daniel Waddle Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Rick Jenne Orlando Cortez Jason Hawthorne Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Raul Velasquez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:04 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford    9 Parada Painting Inc.4 9.5 38.0 20-HEADWORKS AREA     Notes:Primer Created By:  Monica Weiss       26  215.0    Manpower Log's Attachments:  9.  Parada Painting Inc.  2022.02.22 Parada Painting.pdf   FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:04 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 07:55AM   AMAZON Apollo Valve    Comments:Created By: Monica Weiss 2 07:55AM   Burt Industrial Supply 103861 471-204    Comments:Hose Bibb Created By: Monica Weiss 3 07:55AM   Ferguson Enterprises, LLC 471-200 A72 A60 Instrumentation    Comments:Created By: Monica Weiss 4 07:55AM   Harrington Industrial Plastics LLC MR135 Injection Quill Valves    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:04 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   5 07:55AM   JB DEWAR, INC Nozzle    Comments:Created By: Monica Weiss 6 07:55AM   PACIFIC COAST BOLT CORP 1094882    Comments:471-208 Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.02.22 Amazon Apollo Valve.pdf 2.  2022.02.22 Burt Industrial Supply 103861 471-204.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:04 AM PST        3.  2022.02.22 Ferguson 471-200 A72 A60 Inst.pdf 4.  2022.02.22 Harrington MR135 Inj Q Valve.pdf 5.  2022.02.22 JB Dewar nozzle 195565.pdf   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:04 AM PST        6.  2022.02.22 Pacific Coast Bolt 1094882 471-208.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 43°F 51°F 47°F 0.08 in.0.08 in.0.08 in.56%69%86%37°F 7.6 mph 13 mph 24 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   44°F Rain   50°F Partly Cloudy   51°F Partly Cloudy   52°F Partly Cloudy   49°F Rain   46°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 08:40:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:04 AM PST