Loading...
HomeMy WebLinkAbout2022-02-23FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 2/23/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Organizing the connexes and the laborers yard - Jobsite clean up - We are working on the curb and gutter sub grade all over the job. - Potholing for the PW line, repairs and testing continue - Backfilling for the PW line continues - Putting together the shoring boxes - The Chemical vaults south of the chemical building are ready for concrete at the bottom (pour is scheduled for (Tuesday March 1) 2 Daniel Ford No 20-HEADWORKS AREA - We are piping for the 2 added hose bibs in the Headworks area - The supports for the Foul air are being worked on. - The supports for the Hose bibs for the top of the head works is being instaled. 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The 3/4 inch SS lines are being installed for the bypass air - Install the bolts at the PRW pumps - Work continues for on mounting all the cassette tank and the FRP lids is ongoing - Bolts are being installed everywhere in this area - Anchors and supports for the MBR are being installed - The FRP deck is being installed 4 Daniel Ford No 60-PRODUCT WATER AREA - We fabricated and installed the 10" Steel Pipe fittings for the IPR tanks - Instruments are being installed at the IPR, Product water tank, and the calcite tank - Anchor supports for the outfall slab are being installed   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:05 AM PST          NOTES LOG    No.Created By Issue?Location Comments   5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Work continues for the diffuser install and for the blower piping (Mostly Bolt up today) 6 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - The conveyor at the dewatering is being assembled 7 Monica Weiss No SAFETY Angel Diaz Notes Log's Attachments: 7.  2022.02.23 Angel Diaz Incident Report.pdf   MANPOWER LOG 25 Workers  |   209.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Martin Castillo Norman Gularte Daniel Waddle Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:05 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Rick Jenne Orlando Cortez Jason Hawthorne Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Micha Pixley Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.2 9.0 18.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Samuel Rannals Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:05 AM PST        No.Contact/Company Workers # Hours Man Hours Location     9 Parada Painting Inc.4 10.0 40.0     Notes:Painting 1 apprentice 3 Jrny Created By:  Monica Weiss       25  209.0    Manpower Log's Attachments:  9.  Parada Painting Inc.  2022.02.23 Parada Painting.pdf 2022.02.23.1 Parada Painting.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:05 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 08:05AM   JB DEWAR, INC 195488 Fuel    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.02.23 JB Dewar 195488.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 37°F 53°F 45°F 0.02 in.0.10 in.0.10 in.42%61%83%32°F 7.2 mph 15 mph 23 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   38°F Clear   46°F Clear   51°F Clear   53°F Clear   50°F Clear   45°F   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:05 AM PST          OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:40:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:05 AM PST