Loading...
HomeMy WebLinkAbout2022-02-25FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 2/25/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Organizing the connexes and the laborers yard - Jobsite clean up - We are working on the curb and gutter sub grade all over the job. - Organizing the connex, yard, and gathering materials - Wattles were being installed today. - Potholing for PW and the PRW line, as well testing and backfilling. - Breakdown and building the shoring boxes - Excavation for the tie in at the front is happening (Common trench) - We set the shoring box in the front area and safed off the area. 2 Daniel Ford No 20-HEADWORKS AREA - We are working on the hose bib supports 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The 3/4 inch SS lines are being installed for the bypass air - The 2" prw hose bib for the Hose bib at the cassette tank is being installed - Work continues for on mounting all the cassette tank and the FRP lids is ongoing - Bolts are being installed everywhere in this area - Anchors and supports for the MBR are being installed - We installed the modified spool for the air cassette tank - The instruments for the Scum tank and the RO feed were installed 4 Daniel Ford No 60-PRODUCT WATER AREA - Work continues on the pipe supports for the calcite and and the outfall areas   FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 10:05 AM PST          NOTES LOG    No.Created By Issue?Location Comments   5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Instruments are being installed - Hose bib supports are being installed 6 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - The conveyor at the dewatering is being assembled - The Convertor supports continue to be installed   MANPOWER LOG 24 Workers  |   200.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Parada Painting Inc.4 10.0 40.0 70-RESIDUALS AREA     Notes:Primer on Safe Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.6 8.0 48.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Estaban zamudio Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Rick Jenne     FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 10:05 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Orlando Cortez Jason Hawthorne Created By:  Daniel Ford  5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 7.0 7.0     Notes:Labor Forman Ricardo Belmontez Created By:  Daniel Ford       24  200.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 10:05 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 41°F 60°F 48°F 0.00 in.0.00 in.0.02 in.27%51%68%28°F 4.8 mph 10 mph 14 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   44°F Clear   48°F Clear   60°F Clear   57°F Clear   50°F Clear   45°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 10:05 AM PST