Loading...
HomeMy WebLinkAbout2022-03-01FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 3/1/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Organizing the connexes and the laborers yard 2 Daniel Ford No 20-HEADWORKS AREA - We are working on the hose bib supports 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The AA Piping work continues. It is being modified to work with the FRP cover. - Work continues on the 3/4 ss piping - We are anchor down the SS air lines 4 Daniel Ford No 60-PRODUCT WATER AREA - Pipe support grouting continues in this area. 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Instruments are being installed - Hose bib supports are being installed 6 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - The conveyor at the dewatering is being assembled - The Convertor supports continue to be installed - Unistrut supports are being installed - The SS frame for the belts is being assembled - We are installing the polymer piping and and supports - The 1" polymer pipe - The strut for for the 1" strut supports is being bolted down and secured 7 Daniel Ford No 90-CHEMICAL FACILITY - We are laying out and forming the chem building panels   FBV Morro Bay Joint Venture Page 1 of 10 Printed on 1/24/2023 at 10:06 AM PST          MANPOWER LOG 27 Workers  |   225.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Parada Painting Inc.4 10.0 40.0 70-RESIDUALS AREA     Notes:Primer on Safe Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Estaban zamudio Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Jason Hawthorne Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Enrique Padilla Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 10 Printed on 1/24/2023 at 10:06 AM PST        No.Contact/Company Workers # Hours Man Hours Location     7 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    10 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland      27  225.0    Manpower Log's Attachments:  1.  Parada Painting Inc.  2022.03.01 Parada DFR.pdf 10.  ELECTRICRAFT, INC.    3-1-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 10 Printed on 1/24/2023 at 10:06 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 03:15PM   CalPortland Chem Vaults    Comments:Created By: Monica Weiss 2 03:15PM   DUHIG Chem Flanges US Pipe    Comments:Created By: Monica Weiss 3 03:15PM   Ferguson Enterprises, LLC 168.1 9742565-1    Comments:Created By: Monica Weiss 4 03:15PM   Ferguson Enterprises, LLC 471-158.1 9703998    Comments:Created By: Monica Weiss 5 03:15PM   Ferguson Enterprises, LLC 471-161 9706798    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 10 Printed on 1/24/2023 at 10:06 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   6 03:15PM   Ferguson Enterprises, LLC 471-176 A30    Comments:Created By: Monica Weiss 7 03:15PM   Ferguson Enterprises, LLC 471-213 Ball Valves    Comments:Created By: Monica Weiss 8 03:15PM   Ferguson Enterprises, LLC 471-214 PVC 90    Comments:Created By: Monica Weiss 9 03:15PM   Ferguson Enterprises, LLC 471-219 9794440    Comments:Created By: Monica Weiss 10 03:15PM   Ferguson Enterprises, LLC 471-219 glue    Comments:Created By: Monica Weiss 11 03:15PM   Harrington Industrial Plastics LLC 471-206.1 12x2 PVC A50    Comments:Created By: Monica Weiss 12 03:15PM   Harrington Industrial Plastics LLC Apollo Ball Valves 4L3415    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.03.01 Calportland Chem Vaults.pdf   FBV Morro Bay Joint Venture Page 5 of 10 Printed on 1/24/2023 at 10:06 AM PST        2.  2022.03.01 Duhig US P Chem Flanges.pdf 3.  2022.03.01 Ferguson 168.1 9742565-1.pdf 4.  2022.03.01 Ferguson 471-158.1 9703998.pdf   FBV Morro Bay Joint Venture Page 6 of 10 Printed on 1/24/2023 at 10:06 AM PST        5.  2022.03.01 Ferguson 471-161 9706798.pdf 6.  2022.03.01 Ferguson 471-176 A30.pdf 7.  2022.03.01 Ferguson 471-213 Ball Valves 9782875-1.pdf   FBV Morro Bay Joint Venture Page 7 of 10 Printed on 1/24/2023 at 10:06 AM PST        8.  2022.03.01 Ferguson 471-214 9783557 PVC 90.pdf 9.  2022.03.01 Ferguson 471-219 979400.pdf 10.  2022.03.01 Ferguson 471-219 Glue 97944440.pdf   FBV Morro Bay Joint Venture Page 8 of 10 Printed on 1/24/2023 at 10:06 AM PST        11.  2022.03.01 Harrington 471-206.1 12x2 PVC A50.pdf 12.  2022.03.01 Harrington Apollo Ball Valves4L3415-1.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 58°F 75°F 64°F 0.00 in.0.00 in.0.00 in.30%45%69%42°F 6.9 mph 10 mph 19 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   64°F Clear   65°F Partly Cloudy   76°F Partly Cloudy   65°F Partly Cloudy   60°F Partly Cloudy   65°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 02:25:00 PM No     FBV Morro Bay Joint Venture Page 9 of 10 Printed on 1/24/2023 at 10:06 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 10 of 10 Printed on 1/24/2023 at 10:06 AM PST