Loading...
HomeMy WebLinkAbout2022-03-03FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 3/3/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Organizing the connexes and the laborers yard - The Subgrade work continues - Form removal for the headworks, and outfall areas - We repaired the frog fence today -All open chemical manholes were barricaded (these must remain open for 23 days the allow the moisture to evaporate out of the concrete for the Temaric coating) 2 Daniel Ford No 20-HEADWORKS AREA - We are working on the hose bib supports 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The AA Piping work continues. It is being modified to work with the FRP cover. - Work continues on the 3/4 ss piping - We modified the 6" SS Air (expansions joints) - Flow switch for the Outfall was installed 4 Daniel Ford No 60-PRODUCT WATER AREA - Pipe support grouting continues in this area. - Instruments continue to be installed (Saddle in the IPR line) - We installed the 2" blind for the Outfall tank 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank -Layout for the exterior staircase is going on. 6 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - We are installing the polymer piping and and supports - The 1" polymer pipe - We are fabricating the PRW for the pump at belts 7 Daniel Ford No 90-CHEMICAL FACILITY - We are laying out and forming the chem building panels   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:07 AM PST          MANPOWER LOG 34 Workers  |   266.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Parada Painting Inc.4 10.0 40.0 70-RESIDUALS AREA     Notes:Primer on Safe Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Esteban zamudio Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Jason Hawthorne Orlando Cortez Brian Elgin Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Enrique Padilla Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:07 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    12 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland   13 Allied Steel Co., Inc.3 3.0 9.0     Notes:Sludge tank stair Created By:  Monica Weiss       34  266.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:07 AM PST        1.  Parada Painting Inc.  2022.03.03 Parada DFR.pdf 12.  ELECTRICRAFT, INC.    3-3-2022 Daily Report.xls   13.  Allied Steel Co., Inc.  2022.03.03 Allied DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:07 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 03:45PM   Ferguson Enterprises, LLC 471-219 SS 90    Comments:Created By: Monica Weiss 2 03:45PM   Ferguson Enterprises, LLC 471-219    Comments:Created By: Monica Weiss 3 03:45PM   Miner's Ace Hardware Batteries Survey A70    Comments:Created By: Monica Weiss 4 03:45PM   HD Supply White Cap 46222627 471-220 Set 3G    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.03.03 Ferguson 471-219 ss90.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:07 AM PST        2.  2022.03.03 Ferguson 471-219.pdf 3.  2022.03.03 Miners Battery Survey A70 Dewaer.pdf 4.  2022.03.03 White Cap 46222627 471-220 3G.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 48°F 58°F 53°F 0.00 in.0.00 in.0.00 in.55%72%84%44°F 3.6 mph 7 mph 12 mph   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:07 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   48°F Cloudy   54°F Partly Cloudy   59°F Partly Cloudy   56°F Cloudy   55°F Partly Cloudy   54°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:07 AM PST