Loading...
HomeMy WebLinkAbout2022-03-04FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 3/4/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Organizing the connexes and the laborers yard -All open chemical manholes were barricaded (these must remain open for 23 days the allow the moisture to evaporate out of the concrete for the Temaric coating) - Cleaning the V ditch - Draining the water lines for site tie in and removing nuts and bolts 2 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - We are bolting up the SS air piping for the cassette rank - Work continues on the 3/4 ss piping - The lid for the Cassette tank was put into place and aligned with the piping. - Flow switch for the Outfall was installed 3 Daniel Ford No 60-PRODUCT WATER AREA - Saddles for the IPR drains are being installed - Valves for the 1/2 SS air are being installed - The swedge lock fitting are being installed - 4 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Exterior staircase pads continue - V clamps for the hose bibs - Supports for Air piping are being worked on - We are anchoring supports at the SHT 5 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - We are installing the polymer piping and and supports - The 1" polymer pipe - Work continues on the belt press 6 Daniel Ford No 90-CHEMICAL FACILITY - We are laying out and anchoring down the chem building panels.   FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 10:08 AM PST          MANPOWER LOG 31 Workers  |   223.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland   2 Parada Painting Inc.4 1.5 6.0 70-RESIDUALS AREA     Notes:Hdw & BNR piping Touch up Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Esteban zamudio Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Jason Hawthorne Orlando Cortez Brian Elgin Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Enrique Padilla     FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 10:08 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford       31  223.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    3-4-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 10:08 AM PST        2.  Parada Painting Inc.  2022.03.04 Parada DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 10:08 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 03:50PM   Spray Systems Nozzles    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.03.04 Spray Systems Nozzles .pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 45°F 55°F 50°F 0.00 in.0.00 in.0.00 in.58%72%87%42°F 7.0 mph 14 mph 26 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   50°F Partly Cloudy   54°F Cloudy   55°F Cloudy   53°F Clear   50°F Clear   48°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 08:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 10:08 AM PST