Loading...
HomeMy WebLinkAbout2022-03-07FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 3/7/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Organizing the connexes and the laborers yard - We ae gluing 4in pipe - Cleaning the V ditch - Draining the water lines for site tie in and removing nuts and bolts - Subgrade work continues for Granite - Irrigation install, backfill, and install continues 2 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Installation of instruments - Fabrication and Installation of 2" spray water for the WAS/SCUM is happening today 3 Daniel Ford No 60-PRODUCT WATER AREA - Saddles for the IPR drains are being installed - Valves for the 1/2 SS air are being installed - The swedge lock fitting are being installed - 4 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Exterior staircase pads continue - Fabrication and install of the unistruts is ongoing - 5 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - Work continues on the belt press - Saddles are being installed in this area - Supports are being being anchored down in this area. 6 Daniel Ford No 90-CHEMICAL FACILITY - We are laying out and anchoring down the chem building panels. - We are moving and cleaning all chemical totes   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:08 AM PST          MANPOWER LOG 32 Workers  |   257.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland   2 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Esteban zamudio Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Jason Hawthorne Orlando Cortez Brian Elgin Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Enrique Padilla Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton     FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:08 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  7 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    12 Knecht's Plumbing & Heating, Inc.2 7.0 14.0     Notes:Created By:  Monica Weiss   13 Parada Painting Inc.2 9.0 18.0 60-PRODUCT WATER AREA     Notes:Finish coat on PVC Created By:  Monica Weiss       32  257.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    3-7-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:08 AM PST        12.  Knecht's Plumbing & Heating, Inc.  2022.03.07 Knechts DFR.pdf 13.  Parada Painting Inc.  2022.03.07 Parada DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:08 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   7 shoretech 8.0 No   11:25AM  13-WASH RACK  Notes:Trench box (oil sepperator Created By: Daniel Ford   8 AHERN RENTAL 8.0 No   11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   9 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   10 Shoretec No   11:25AM  12-SOUTH - PIPING  Notes:Trench Box (front entrance) Created By: Daniel Ford   11 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:Bull dozer Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 06:20AM   Sitech Cables    Comments:Created By: Monica Weiss 2 06:20AM   PACIFIC COAST BOLT CORP 1095291 471-221    Comments:Created By: Monica Weiss 3 06:20AM   Miner's Ace Hardware 731882 Coupling    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:08 AM PST        1.  2022.03.07 Sitech Cables.pdf 2.  2022.03.07 Pacific Coast Bolt 1095291 471-221.pdf 3.  2022.03.07 Miners 731882 Couplings Landscape.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 43°F 61°F 50°F 0.00 in.0.00 in.0.03 in.39%62%92%38°F 3.9 mph 9 mph 11 mph   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:08 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   44°F Clear   50°F Clear   61°F Clear   58°F Clear   53°F Clear   47°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 02:00:00 PM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:08 AM PST