Loading...
HomeMy WebLinkAbout2022-03-08FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 3/8/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Organizing the connexes and the laborers yard - We ae glueing 4in pipe - Jobsite clean up - Draining the water lines for site tie in and removing nuts and bolts - Subgrade work continues for Granite - Irrigation install, backfill, and install continues 2 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Installation of instruments - Fabrication and Installation of 2" spray water for the WAS/SCUM is happening today - We are installing the 5" gaskets for the cassette air - We installed the 8" 90 for the filtration pump 3 Daniel Ford No 60-PRODUCT WATER AREA - Saddles for the IPR drains are being installed - Valves for the 1/2 SS air are being installed - The swedge lock fitting are being installed - 4 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Exterior staircase pads continue - Fabrication and install of the unistruts is ongoing - 5 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - Work continues on the belt press - Welding of the supports for this area - Supports are being being anchored down in this area. - Saddles area being installed 6 Daniel Ford No 90-CHEMICAL FACILITY - We are laying out and anchoring down the chem building panels. - We are moving and cleaning all chemical totes 7 Daniel Ford No 50-RO/UV BUILDING - Work continues on the 12" RO feed line   FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 10:09 AM PST          MANPOWER LOG 32 Workers  |   255.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland   2 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Esteban zamudio Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Jason Hawthorne Orlando Cortez Brian Elgin Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Pablo Campoverde Enrique Padilla Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton     FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 10:09 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  7 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    12 Knecht's Plumbing & Heating, Inc.2 5.0 10.0     Notes:Fume Hood Created By:  Monica Weiss    13 Parada Painting Inc.2 10.0 20.0 60-PRODUCT WATER AREA     Notes:Primer at Calcite Created By:  Monica Weiss       32  255.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    3-8-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 10:09 AM PST        12.  Knecht's Plumbing & Heating, Inc.  2022.03.08 Knechts DFR.pdf 13.  Parada Painting Inc.  2022.03.08 Parada DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 10:09 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   7 shoretech 8.0 No   11:25AM  13-WASH RACK  Notes:Trench box (oil sepperator Created By: Daniel Ford   8 AHERN RENTAL 8.0 No   11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   9 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   10 Shoretec No   11:25AM  12-SOUTH - PIPING  Notes:Trench Box (front entrance) Created By: Daniel Ford   11 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:Bull dozer Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 06:50AM   Capital Flow SS Fittings AIS    Comments:AIS Created By: Monica Weiss 2 06:50AM   Dollar Tree Bins Sorting    Comments:Created By: Monica Weiss 3 06:50AM   Family Dollar Bins Sorting    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 10:09 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   4 06:50AM   Ryan Herco 9871840    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.03.08 Capflo SS Fittings AIS.pdf 2.  2022.03.08 Dollar Tree Bins.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 10:09 AM PST        3.  2022.03.08 Family Dollar sort Bins.pdf 4.  2022.03.08 Ryan Herco 9871840 471-224 .pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 47°F 59°F 53°F 0.00 in.0.00 in.0.00 in.43%60%84%39°F 4.9 mph 7 mph 12 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   49°F Clear   58°F Clear   59°F Clear   58°F Clear   54°F Clear   49°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:30:00 AM No     FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 10:09 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 10:09 AM PST