Loading...
HomeMy WebLinkAbout2022-03-14FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 3/14/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - Organizing the connexes and the laborers yard - Wattles on the slopes were being worked on - Fixing the frog fence - Subgrade work continues for Granite - Irrigation install, backfill, and install continues - oil separator (inlet was to high we had to pull box and rework it) - Work continues on the 24" manifold install 2 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Fabrication and installation of pipe supports continues in this area - We are bolting up 14" ball valves - 3 Daniel Ford No 60-PRODUCT WATER AREA - We are bolting up the 10" blind in this area. - Anchoring of supports continues 4 Daniel Ford No 50-RO/UV BUILDING - We fabricated and installed PVC in this building - Fabrication and install of the supports for the 12" line   MANPOWER LOG 27 Workers  |   221.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Esteban zamudio Charlie Gonzales Angel Diaz Norman Gularte     FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 10:10 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Daniel Waddle Manny Hernandez Created By:  Daniel Ford  2 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Rick Jenne Orlando Cortez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 10:10 AM PST        No.Contact/Company Workers # Hours Man Hours Location     8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    11 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland   12 Parada Painting Inc.2 10.0 20.0 20-HEADWORKS AREA     Notes:Headworks touch up Created By:  Monica Weiss       27  221.0    Manpower Log's Attachments:  11.  ELECTRICRAFT, INC.    3-14-2022 Daily Report.xls   12.  Parada Painting Inc.  2022.03.14 Parada DFR.pdf   FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 10:10 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   7 shoretech 8.0 No   11:25AM  13-WASH RACK  Notes:Trench box (oil sepperator Created By: Daniel Ford   8 AHERN RENTAL 8.0 No   11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   9 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   10 Shoretec No   11:25AM  12-SOUTH - PIPING  Notes:Trench Box (front entrance) Created By: Daniel Ford   11 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:Bull dozer Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 10:10 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 08:10AM   AIRGAS 2923 Copper    Comments:Created By: Monica Weiss 2 08:10AM   ASAP Drawings    Comments:Created By: Monica Weiss 3 08:10AM   Capital Flow CS Pipe    Comments:Created By: Monica Weiss 4 08:10AM   Ferguson Enterprises, LLC 471-200 A72-A60    Comments:Created By: Monica Weiss 5 08:10AM   HD Supply White Cap 46318105 Safety    Comments:Created By: Monica Weiss 6 08:10AM   HD Supply White Cap 46352779 Batteries    Comments:Created By: Monica Weiss 7 08:10AM   HD Supply White Cap 46358713 Sawblade    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.03.14 Airgas Copper 2923.pdf   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 10:10 AM PST        2.  2022.03.14 ASAP Civil Dwg.pdf 3.  2022.03.14 Capflo CS Pipe.pdf 4.  2022.03.14 Ferguson 471-200 A72-A60.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 10:10 AM PST        5.  2022.03.14 White Cap 46318105 Safety.pdf 6.  2022.03.14 White Cap 46352779 Batteries.pdf 7.  2022.03.14 White Cap 46358713 Sawblade.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 45°F 65°F 53°F 0.00 in.0.00 in.0.00 in.41%72%95%44°F 5.9 mph 9 mph 15 mph   FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 10:10 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   48°F Clear   54°F Clear   66°F Clear   60°F Clear   58°F Clear   53°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:15:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 10:10 AM PST