Loading...
HomeMy WebLinkAbout2022-03-15FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 3/15/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - We are backfilling the curbs - We are cleaning the back hoe. - Curbs are being backfilled along the entire eastern side of the job in preparation for the fence - We formed the small pad for the electric gate motor (We are placing concrete tomorrow) - Fencing from around the chemical manholes was removed. and 2x4 were placed under the lids so the concrete will continue to dry out. - In Building 16 we are adding the louvers - The 18" gasket at the declor pipe was not sitting right and had to be adjusted. 2 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The turbidity tanks are being moved - Modifications are being made to the 14" valve 3 Daniel Ford No 60-PRODUCT WATER AREA - We are bolting up the 10" blind in this area. - Anchoring of supports continues 4 Daniel Ford No 50-RO/UV BUILDING - We fabricated and installed PVC in this building - Fabrication and install of the supports for the 12" line - We are installing the louvers in the north wall. - supports are being installed in this building. - Holes are being cut in the east wall for the chemical lines. 5 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - Pipe supports were fabricated and delivered to this area - On the NW corner we built some form work for a concrete slab for a removable staircase. 6 Daniel Ford No 95-OPERATIONS BUILDING - We dug the hole for the flag pole and formed everything up. We are ready to place concrete here tomorrow at noon - The drain under the sidewalk near the flag pole has been installed   FBV Morro Bay Joint Venture Page 1 of 10 Printed on 1/24/2023 at 10:11 AM PST          NOTES LOG    No.Created By Issue?Location Comments   7 Daniel Ford No 12-SITE OVERALL - YARD PIPING - We removed all plugs from the Sanitary lift station 8 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We formed up a small slab on the NW corner of the the building so they can bring a stair tower over to use the davit crane. 9 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - We are anchoring down the conveyor belt   MANPOWER LOG 27 Workers  |   221.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Esteban zamudio Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Rick Jenne Orlando Cortez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 10 Printed on 1/24/2023 at 10:11 AM PST        No.Contact/Company Workers # Hours Man Hours Location     4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    11 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland     FBV Morro Bay Joint Venture Page 3 of 10 Printed on 1/24/2023 at 10:11 AM PST        No.Contact/Company Workers # Hours Man Hours Location     12 Parada Painting Inc.2 10.0 20.0 60-PRODUCT WATER AREA>65- Product Water - Disinfection System (includes dechlor station)     Notes:Created By:  Monica Weiss      27  221.0    Manpower Log's Attachments:  11.  ELECTRICRAFT, INC.    3-15-2022 Daily Report.xls   12.  Parada Painting Inc.  2022.03.15 Parada DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 10 Printed on 1/24/2023 at 10:11 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   8 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   9 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:Bull dozer Created By: Daniel Ford   10 United Rental No   10:15AM  00-GENERAL  Notes:Jumping Jack Created By: Daniel Ford   11 United Rental No   10:15AM    Notes:Water truck Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 08:20AM   ASC Pipe Supports    Comments:BNR Created By: Monica Weiss 2 08:20AM   BURT INDUSTRIAL SUPPLY Channel Sockets    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 5 of 10 Printed on 1/24/2023 at 10:11 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   3 08:20AM   Capital Flow BNG Chem Instr    Comments:Created By: Monica Weiss 4 08:20AM   CS - AMSCO Dezurik BNR Valves    Comments:Created By: Monica Weiss 5 08:20AM   Ferguson Enterprises, LLC 9810938 471-225    Comments:Created By: Monica Weiss 6 08:20AM   Ferguson Enterprises, LLC 9819765 471-226.1    Comments:Created By: Monica Weiss 7 08:20AM   Ferguson Enterprises, LLC MR120 Eye Wash    Comments:Created By: Monica Weiss 8 08:20AM   Ferguson Enterprises, LLC 471-230 Strut Clamps    Comments:Created By: Monica Weiss 9 08:20AM   Miner's Ace Hardware 732683    Comments:Created By: Monica Weiss 10 08:20AM   Miner's Ace Hardware 732652 Cold Patch    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.03.15 ASC Pipe Supports.pdf   FBV Morro Bay Joint Venture Page 6 of 10 Printed on 1/24/2023 at 10:11 AM PST        2.  2022.03.15 Burt Industrial Sup Channel Socket.pdf 3.  2022.03.15 Capflo BNG Chem Inst.pdf 4.  2022.03.15 Dezurik BNR Valves A31.pdf   FBV Morro Bay Joint Venture Page 7 of 10 Printed on 1/24/2023 at 10:11 AM PST        5.  2022.03.15 Ferguson 9810938 471-225.pdf 6.  2022.03.15 Ferguson 9819765 471-226.1.pdf 7.  2022.03.15 Ferguson MR120 9600407-4 EYE Wash.pdf   FBV Morro Bay Joint Venture Page 8 of 10 Printed on 1/24/2023 at 10:11 AM PST        8.  2022.03.15 Ferguson Strut Clamp 471-230.pdf 9.  2022.03.15 Miners 732683 218.77.pdf 10.  2022.03.15 Miners Cold Patch 732652.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 47°F 61°F 54°F 0.00 in.0.00 in.0.00 in.73%86%93%49°F 4.5 mph 10 mph 18 mph   FBV Morro Bay Joint Venture Page 9 of 10 Printed on 1/24/2023 at 10:11 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   48°F Partly Cloudy   52°F Partly Cloudy   61°F Partly Cloudy   59°F Partly Cloudy   56°F Clear   55°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 10:15:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 10 of 10 Printed on 1/24/2023 at 10:11 AM PST