Loading...
HomeMy WebLinkAbout2022-03-17FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 3/17/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - We are backfilling the curbs - Wattles are being removed from the road - Curbs are being backfilled along the entire eastern side of the job in preparation for the fence - Concrete was placed in the pad for the electrical gate motor, the staircase pad at the NW corner of the BNR tank, and the flagpole base. - Jobsite Clean up - Ricardo, Jonathan,Manny, Enrique,Phillip, And Trevor took a shoring class off site. 2 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Pancakes were being removed from the 12, and 18 inch lines on the south side of the MBR slab. - 3 Daniel Ford No 50-RO/UV BUILDING - We fabricated and installed PVC in this building - We are installing the louvers in the north wall. - FRP supports are being installed in this building for the chemical lines. - Holes are being cut in the east wall for the chemical lines. 4 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We are installing the BV Air in this area. - The ariel life showed up on site and we ran it out to make it would reach everywhere we needed. - We brought up all the pipe supports and valves to this area. 5 Daniel Ford No 95-OPERATIONS BUILDING - We dug the hole for the flag pole and formed everything up. We are ready to place concrete here tomorrow at noon - The drain under the sidewalk near the flag pole has been installed   FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 10:12 AM PST          MANPOWER LOG 30 Workers  |   233.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland   2 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Esteban zamudio Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Alex Rios lopez Teddy Maldanado Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Rick Jenne Orlando Cortez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton     FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 10:12 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  7 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    12 Allied Steel Co., Inc.3 4.0 12.0     Notes:GRATING Created By:  Monica Weiss    13 Parada Painting Inc.2 10.0 20.0 20-HEADWORKS AREA     Notes:Created By:  Monica Weiss      30  233.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    3-17-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 10:12 AM PST        12.  Allied Steel Co., Inc.  2022.03.17 Allied DFR.pdf 13.  Parada Painting Inc.  2022.03.17 Parada DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 0.0 No   06:05AM  00-GENERAL  Notes:18000 pound mini excavator Created By: Daniel Ford   2 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   05:40AM    Notes:Scissor lift Created By: Daniel Ford   4 United Rental 8.0 No   03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 10:12 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   5 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   7 AHERN RENTAL 8.0 No   11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   8 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   9 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:Bull dozer Created By: Daniel Ford   10 United Rental No   10:15AM  00-GENERAL  Notes:Jumping Jack Created By: Daniel Ford   11 United Rental No   10:15AM    Notes:Water truck Created By: Daniel Ford   12 AHERN RENTAL 8.0 No   02:10PM    Notes:35' Ariel lift Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 11:10AM   Allied Steel Co., Inc.Angle    Comments:Created By: Monica Weiss 2 11:10AM   CalPortland 1739830 Eq Pad Flagpole    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 10:12 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   3 11:10AM   Ferguson Enterprises, LLC 471-235    Comments:Created By: Monica Weiss 4 11:10AM   Miner's Ace Hardware 732929 A50    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.03.17 Allied Steel Angle.pdf 2.  2022.03.17 Calportland 1739830 Eqpad Flagpole.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 10:12 AM PST        3.  2022.03.17 Ferguson 471-235.pdf 4.  2022.03.17 Miners 732929 A50.pdf 2022.03.17 Ferguson 471-235.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 48°F 61°F 53°F 0.00 in.0.00 in.0.00 in.67%82%99%48°F 3.6 mph 7 mph 10 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   50°F Clear   50°F Cloudy   57°F Cloudy   62°F Clear   58°F Cloudy   51°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:20:00 AM No     FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 10:12 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 10:12 AM PST