Loading...
HomeMy WebLinkAbout2022-03-18FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 3/18/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - We are backfilling the curbs and gutters over the entire site - Concrete form work was removed for the pad for the electrical gate motor, the staircase pad at the NW corner of the BNR tank, and the flagpole base. - Jobsite Clean up - Ricardo, Jonathan,Manny, Enrique, And Trevor took a confined space class. - We are installing the fire extinguisher in building 16 2 Daniel Ford No 50-RO/UV BUILDING - We fabricated and installed PVC in this building - FRP supports are being installed in this building for the chemical lines. - Holes are being cut in the east wall for the chemical lines. - We are installing the fire extinguisher in this building. 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We are installing the BV Air in this area. - Flow meters are being installed - The auto valves for the 4" and 5" are being installed 4 Daniel Ford No 95-OPERATIONS BUILDING - granite continues with there curbs in this building. - We are installing the fire extinguisher in this building. 5 Daniel Ford No 96-MAINTENANCE BUILDING - We are installing the fire extinguisher in this building. - The sinks are being installed in the lab   MANPOWER LOG 25 Workers  |   201.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland     FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:12 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Esteban zamudio Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Teddy Maldonado Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Rick Jenne Orlando Cortez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Rafael Alvarado Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:12 AM PST        No.Contact/Company Workers # Hours Man Hours Location     8 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford       25  201.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    3-18-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 United Rental 8.0 Yes  03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:12 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   4 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   5 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   6 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   7 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:Bull dozer Created By: Daniel Ford   8 United Rental Yes  10:15AM  00-GENERAL  Notes:Jumping Jack Created By: Daniel Ford   9 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   10 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   11 No   05:30AM    Notes:Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 11:20AM   Ferguson Enterprises, LLC 471-239 A50    Comments:Created By: Monica Weiss 2 11:20AM   Ferguson Enterprises, LLC 471-240 9825693    Comments:Created By: Monica Weiss 3 11:20AM   Jensen Precast Trench Grate    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:12 AM PST        Delivery Log's Attachments: 1.  2022.03.18 Ferguson 471-239 A50.pdf 2.  2022.03.18 Ferguson 471-240 9825693.pdf 3.  2022.03.18 Jensen Precast Grate Trench.pdf   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:12 AM PST          WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 47°F 59°F 53°F 0.00 in.0.00 in.0.00 in.62%77%90%46°F 4.5 mph 8 mph 13 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   51°F Clear   53°F Clear   58°F Clear   59°F Clear   57°F Partly Cloudy   53°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 01:20:00 PM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:12 AM PST