Loading...
HomeMy WebLinkAbout2022-03-21FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 3/21/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - We are backfilling the curbs and gutters over the entire site - Jobsite Clean up - We worked on a leak at the 24" declor pipe. - Tied in the main water supply for the fire hydrants - Work continued on oil separator. We ordered slurry (2.5 yards) for tomorrow at 11 am. - We patched in the low spot for the V ditch north of the head works. 2 Daniel Ford No 50-RO/UV BUILDING - We fabricated and installed PVC in this building - FRP supports are being installed in this building for the chemical lines. - Holes are being cut in the east wall for the chemical lines. - We are installing the fire extinguisher in this building. 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We are installing the BV Air in this area. - Flow meters are being installed - The auto valves for the 4" and 5" are being installed - Supports are being welded up for the Air piping - We cut FRP decking and checked height for the ss cassette brackets. 4 Daniel Ford No 95-OPERATIONS BUILDING - granite continues with there curbs in this building. - We are installing the fire extinguisher in this building. 5 Daniel Ford No 96-MAINTENANCE BUILDING - We are installing the fire extinguisher in this building. - The sinks are being installed in the lab 6 Daniel Ford No 60-PRODUCT WATER AREA - We removed all materials from this area - Started testing the IPR and outfall pumps in this area. - pumps were adjusted and connected. - Pipe Supports continued to be grouted in   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:13 AM PST          NOTES LOG    No.Created By Issue?Location Comments   7 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Link seals were installed in the east wall 8 Daniel Ford No 20-HEADWORKS AREA>23- Headworks Area - Odor Control - The FRP strut was installed on the top of the foul air tank - Kusters is here troubleshooting problems, taking care of punch list items, and working on start up procedures.   MANPOWER LOG 28 Workers  |   221.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Esteban zamudio Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Teddy Maldonado Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Rick Jenne Orlando Cortez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:13 AM PST        No.Contact/Company Workers # Hours Man Hours Location     4 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Rafael Alvarado Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 0.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    11 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:13 AM PST        No.Contact/Company Workers # Hours Man Hours Location     12 Parada Painting Inc.2 10.0 20.0 20-HEADWORKS AREA     Notes:Created By:  Monica Weiss      28  221.0    Manpower Log's Attachments:  11.  ELECTRICRAFT, INC.    3-21-2022 Daily Report.xls   12.  Parada Painting Inc.  2022.03.21 Parada DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 United Rental 8.0 Yes  03:05PM  00-GENERAL  Notes:24k generator Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:13 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   5 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   6 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   7 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:Bull dozer Created By: Daniel Ford   8 United Rental Yes  10:15AM  00-GENERAL  Notes:Jumping Jack Created By: Daniel Ford   9 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   10 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   11 No   05:30AM    Notes:Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 11:25AM   Ferguson Enterprises, LLC 471-240    Comments:Created By: Monica Weiss 2 11:25AM   Capital Flow Alloy 20 Pipe AIS    Comments:AIS Created By: Monica Weiss 3 11:25AM   Miner's Ace Hardware 733171 Drip Pans    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:13 AM PST        1.  2022.03.21 Ferguson 471-240.pdf 2.  2022.03.21 Capflo alloy 20 Pipe AIS.pdf 3.  2022.03.21 Miners Drip pans 733171.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 47°F 60°F 53°F 0.00 in.0.00 in.0.06 in.43%72%86%44°F 4.5 mph 8 mph 12 mph   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:13 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   49°F Clear   55°F Partly Cloudy   56°F Partly Cloudy   56°F Clear   56°F Clear   53°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:55:00 AM No   2 No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:13 AM PST