HomeMy WebLinkAbout2022-03-21FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Monday 3/21/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed.
- We are backfilling the curbs and gutters over the entire site
- Jobsite Clean up
- We worked on a leak at the 24" declor pipe.
- Tied in the main water supply for the fire hydrants
- Work continued on oil separator. We ordered slurry (2.5
yards) for tomorrow at 11 am.
- We patched in the low spot for the V ditch north of the head
works.
2 Daniel Ford No 50-RO/UV BUILDING - We fabricated and installed PVC in this building
- FRP supports are being installed in this building for the
chemical lines.
- Holes are being cut in the east wall for the chemical lines.
- We are installing the fire extinguisher in this building.
3 Daniel Ford No 30-TREATMENT AREA>31-
Treatment Area - BNR
Basins
- We are installing the BV Air in this area.
- Flow meters are being installed
- The auto valves for the 4" and 5" are being installed
- Supports are being welded up for the Air piping
- We cut FRP decking and checked height for the ss cassette
brackets.
4 Daniel Ford No 95-OPERATIONS
BUILDING
- granite continues with there curbs in this building.
- We are installing the fire extinguisher in this building.
5 Daniel Ford No 96-MAINTENANCE
BUILDING
- We are installing the fire extinguisher in this building.
- The sinks are being installed in the lab
6 Daniel Ford No 60-PRODUCT WATER AREA - We removed all materials from this area
- Started testing the IPR and outfall pumps in this area.
- pumps were adjusted and connected.
- Pipe Supports continued to be grouted in
FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:13 AM PST
NOTES LOG
No.Created By Issue?Location Comments
7 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
- Link seals were installed in the east wall
8 Daniel Ford No 20-HEADWORKS AREA>23-
Headworks Area - Odor
Control
- The FRP strut was installed on the top of the foul air tank
- Kusters is here troubleshooting problems, taking care of
punch list items, and working on start up procedures.
MANPOWER LOG 28 Workers | 221.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Esteban zamudio
Charlie Gonzales
Angel Diaz
Norman Gularte
Daniel Waddle
Manny Hernandez
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL
Notes:LABORER APPRENTICE
Jonathan Torres
Teddy Maldonado
Javier Trevino
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Coy Brite
Rick Jenne
Orlando Cortez
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:13 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
4 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL
Notes:CARPENTER APPRENTICE
Micha Pixley
Enrique Padilla
Rafael Alvarado
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Certified Welder Pipefitter
Rick Dayton
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL
Notes:APPRENTICE CEMENT MASON
Adolfo Campoverde
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Kyle Brooking
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Cement Mason
Daniel Sheslingoff
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.1 0.0 0.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
10 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter Foreman
Phil Lacey
Created By: Daniel Ford
11 ELECTRICRAFT, INC.5 8.0 40.0
Notes:Created By: Rick Howland
FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:13 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
12 Parada Painting Inc.2 10.0 20.0 20-HEADWORKS
AREA
Notes:Created By: Monica Weiss
28 221.0
Manpower Log's Attachments:
11. ELECTRICRAFT, INC.
3-21-2022 Daily Report.xls
12. Parada Painting Inc.
2022.03.21 Parada DFR.pdf
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 Yes 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
2 United Rental 8.0 Yes 03:05PM 00-GENERAL
Notes:24k generator
Created By: Daniel Ford
3 AHERN RENTAL 8.0 Yes 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 Yes 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:13 AM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
5 AHERN RENTAL 8.0 Yes 11:25AM 00-GENERAL
Notes:Skid steer
Created By: Daniel Ford
6 United Rental 8.0 Yes 11:25AM 00-GENERAL
Notes:loader
Created By: Daniel Ford
7 United Rental 8.0 Yes 11:25AM 00-GENERAL
Notes:Bull dozer
Created By: Daniel Ford
8 United Rental Yes 10:15AM 00-GENERAL
Notes:Jumping Jack
Created By: Daniel Ford
9 United Rental Yes 10:15AM
Notes:Water truck
Created By: Daniel Ford
10 AHERN RENTAL 8.0 Yes 02:10PM
Notes:35' Ariel lift
Created By: Daniel Ford
11 No 05:30AM
Notes:Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 11:25AM Ferguson Enterprises, LLC 471-240
Comments:Created By: Monica Weiss
2 11:25AM Capital Flow Alloy 20 Pipe AIS
Comments:AIS
Created By: Monica Weiss
3 11:25AM Miner's Ace Hardware 733171 Drip Pans
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:13 AM PST
1.
2022.03.21 Ferguson 471-240.pdf
2.
2022.03.21 Capflo alloy 20 Pipe AIS.pdf
3.
2022.03.21 Miners Drip pans 733171.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
47°F 60°F 53°F 0.00 in.0.00 in.0.06 in.43%72%86%44°F 4.5 mph 8 mph 12 mph
FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:13 AM PST
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
49°F
Clear
55°F
Partly Cloudy
56°F
Partly Cloudy
56°F
Clear
56°F
Clear
53°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 05:55:00 AM No
2 No
By Date Copies To
FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:13 AM PST