Loading...
HomeMy WebLinkAbout2022-03-23FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 3/23/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Continued watering the hydro seed. - We are backfilling the curbs and gutters over the entire site - The fencing contractor was digging for the frog fencing on the east side of the curb - The 24" PVC declor pipe is being modified - We backfilled the rest of the oil separator - The patch for low spot for the V ditch north of the head works. - 1.5 hours excavate for relocation of electrical - We spent a couple of hours of working in the ravine - Misc punch list items are being taken care of. (Louvers, Sinks in the lab, Fire extinguishers) - We tightened up and gave some support to the start up team for the Sanitary sewer system - 16 man hours spent on backfilling, digging, relocating electrical conduit. then digging for the eastern fence 2 Daniel Ford No 50-RO/UV BUILDING - We fabricated and installed PVC in this building - FRP supports are being installed in this building for the chemical lines. 3 Daniel Ford No 96-MAINTENANCE BUILDING - We are installing the fire extinguisher in this building. - The sinks are being installed in the lab 4 Daniel Ford No 60-PRODUCT WATER AREA - We removed all materials from this area - Started testing the IPR and outfall pumps in this area. - pumps were adjusted and connected. - Pipe Supports continued to be grouted in 5 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We are working on the pipe supports and welding the Stainless steel plates for this area. - Some safety items above the mixing chimney, to give personal access to that area.   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:14 AM PST          NOTES LOG    No.Created By Issue?Location Comments   6 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - We gave the startup guys confined space, and fall protection - The Safe filter has been filled and the start up work continues 7 Daniel Ford No 20-HEADWORKS AREA - The FRP strut was installed on the top of the foul air tank - Kusters is here troubleshooting problems, taking care of punch list items, and working on start up procedures.   MANPOWER LOG 25 Workers  |   197.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Esteban zamudio Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:LABORER APPRENTICE Jonathan Torres Teddy Maldonado Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Rick Jenne Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:14 AM PST        No.Contact/Company Workers # Hours Man Hours Location     4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Rafael Alvarado Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 9.0 9.0 00-GENERAL     Notes:APPRENTICE CEMENT MASON Adolfo Campoverde Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 0.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    11 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:14 AM PST        No.Contact/Company Workers # Hours Man Hours Location     12 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss      25  197.0    Manpower Log's Attachments:  11.  ELECTRICRAFT, INC.    3-23-2022 Daily Report.xls   12.  Parada Painting Inc.  2022.03.23 Parada DFR.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:14 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   5 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:Bull dozer Created By: Daniel Ford   7 United Rental Yes  10:15AM  00-GENERAL  Notes:Jumping Jack Created By: Daniel Ford   8 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   9 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   10 No   05:30AM    Notes:Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 11:35AM   Fastenal Strut    Comments:Created By: Monica Weiss 2 11:35AM   Ferguson Enterprises, LLC Strut Clamps    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:14 AM PST        1.  2022.03.23 Fastenal Strut.pdf 2.  2022.03.23 Ferguson Strut Clamps.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 56°F 52°F 0.00 in.0.00 in.0.00 in.82%90%95%49°F 3.4 mph 5 mph 9 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   51°F Clear   51°F Clear   54°F Clear   56°F Clear   53°F Clear   51°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:05:00 AM No     FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:14 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:14 AM PST