HomeMy WebLinkAbout2022-03-28FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Monday 3/28/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Rain Event today lots of work from BMP's to water
management, to clean up
- The 24" PVC declor pipe is being modified
- organizing and cleaning up conexs and the yard
2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue
- FRP supports are being installed in this building for the
chemical lines.
3 Daniel Ford No 30-TREATMENT AREA>31-
Treatment Area - BNR
Basins
- We are working on the pipe supports and welding the
Stainless steel plates for this area.
- Fabrication and grinding continues for the support plates
4 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
- We patched all remaining holes in the SAFE settle tank and
the SHT
- All items have been removed and the SAFE settle tank is
being filled with clean water
- We are filing the SAFE filter tank with water.
- Both SHT's are cleaned and ready to be filled with water to
test the air diffusers.
5 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- Angle is being cut and fabricated for the cassette tank
MANPOWER LOG 22 Workers | 168.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 10:15 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Charlie Gonzales
Angel Diaz
Norman Gularte
Daniel Waddle
Manny Hernandez
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL
Notes:LABORER APPRENTICE
Jonathan Torres
Teddy Maldonado
Javier Trevino
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Coy Brite
Rick Jenne
Orlando Cortez
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:CARPENTER APPRENTICE
Micha Pixley
Enrique Padilla
Rafael Alvarado
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Certified Welder Pipefitter
Rick Dayton
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Kyle Brooking
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 10:15 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Cement Mason
Daniel Sheslingoff
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 0.0 0.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
9 1 8.0 8.0
Notes:Carpenter Foreman
Phil Lacey
Created By: Daniel Ford
10 ELECTRICRAFT, INC.4 8.0 32.0
Notes:Created By: Rick Howland
22 168.0
Manpower Log's Attachments:
10. ELECTRICRAFT, INC.
3-28-2022 Daily Report.xls
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 No 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
2 AHERN RENTAL 8.0 No 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
3 AHERN RENTAL 8.0 No 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 No 11:25AM 00-GENERAL
Notes:Skid steer
FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 10:15 AM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
Created By: Daniel Ford
5 United Rental 8.0 No 11:25AM 00-GENERAL
Notes:loader
Created By: Daniel Ford
6 United Rental No 10:15AM 00-GENERAL
Notes:Jumping Jack
Created By: Daniel Ford
7 United Rental No 10:15AM
Notes:Water truck
Created By: Daniel Ford
8 AHERN RENTAL 8.0 No 02:10PM
Notes:35' Ariel lift
Created By: Daniel Ford
9 No 05:30AM
Notes:Created By: Daniel Ford
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
50°F 57°F 54°F 1.04 in.1.09 in.1.10 in.66%83%92%49°F 6.6 mph 16 mph 25 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Rain
55°F
Rain
55°F
Rain
56°F
Rain
55°F
Rain
56°F
Partly Cloudy
54°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 07:25:00 AM No
FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 10:15 AM PST
By Date Copies To
FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 10:15 AM PST