HomeMy WebLinkAbout2022-03-29FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 3/29/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Site clean up - excavate for fence - The 24" PVC declor pipe is being modified - organizing and cleaning up conexs and the yard - Prep backhoe for shipment - Rust stains were being removed from slabs - Mud is being cleaned out of the v ditches after the rain event. 2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue - FRP supports are being installed in this building for the chemical lines. - We are setting up sidewalks outside on the north and south entrance 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We are working on the pipe supports and welding the Stainless steel plates for this area. - Fabrication, and grinding continues for the support plates - Both tanks are being cleaned and filled with water to a inch above the diffusers 4 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - We patched all remaining holes in the SAFE settle tank and the SHT - All items have been removed and the SAFE settle tank is being filled with clean water - We are filing the SAFE filter tank with water. - Both SHT's are cleaned and ready to be filled with water to test the air diffusers. 5 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Angle is being cut and fabricated for the cassette tank - Blinds are being installed form the scum tank - angel is being cut for the cassette tank supports   FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 10:16 AM PST          NOTES LOG    No.Created By Issue?Location Comments   6 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - Ball valves are being installed for the drains 7 Daniel Ford No 60-PRODUCT WATER AREA - The octagon for the 20" outfall overflow support is being fabricated - a concrete pad and support is being made for the southern pipe for the outfall balance tank   MANPOWER LOG 22 Workers  |   168.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Rick Jenne Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 10:16 AM PST        No.Contact/Company Workers # Hours Man Hours Location     4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 0.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    9 1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    10 1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford    11 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland      22  168.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 10:16 AM PST        11.  ELECTRICRAFT, INC.    3-29-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental No   10:15AM  00-GENERAL  Notes:Jumping Jack Created By: Daniel Ford   7 United Rental No   10:15AM    Notes:Water truck Created By: Daniel Ford   8 AHERN RENTAL 8.0 No   02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   9 No   05:30AM    Notes:Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 10:16 AM PST          WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 46°F 56°F 52°F 0.00 in.1.04 in.1.10 in.77%86%94%48°F 6.2 mph 12 mph 19 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   47°F Clear   51°F Partly Cloudy   56°F Partly Cloudy   56°F Partly Cloudy   55°F Partly Cloudy   52°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:15:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 10:16 AM PST