Loading...
HomeMy WebLinkAbout2022-03-31FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 3/31/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - We were working on the landscape sub grade - Layout, excavation, for the trench behind the chem building - Excavation and pipe install for the 2" pipe for pond 1 man hole pump. - The 24" PVC declor pipe is being modified - The V ditches were being cleaned out and the dirt around them is being leveled out for the landscapers - We put fencing up around the open chem vault man holes 2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue - FRP supports are being installed in this building for the chemical lines. - We are setting up sidewalks outside on the north and south entrance - Forming pipe supports pads - We epoxied in anchors for the 3 chemical tanks and the UV system 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We are working on the pipe supports and welding the Stainless steel plates for this area. - Fabrication, and grinding continues for the support plates - Both tanks are being cleaned and filled with water to a inch above the diffusers 4 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - We patched all remaining holes in the SAFE settle tank and the SHT - All items have been removed and the SAFE settle tank is being filled with clean water - We are filing the SAFE filter tank with water. - Both SHT's are cleaned and ready to be filled with water to test the air diffusers. 5 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Angle is being cut and fabricated for the cassette tank - Blinds are being installed form the scum tank - angel is being cut for the cassette tank supports   FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 10:16 AM PST          NOTES LOG    No.Created By Issue?Location Comments   - Pipe supports pads - the stainless steel air lines are being pickled 6 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - Ball valves are being installed for the drains 7 Daniel Ford No 60-PRODUCT WATER AREA - We are working on the grout pads and some pipe supports. 8 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - Forming pipe supports pads 9 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install RO supports in the chem area - Layout in this area - Eye wash stations are being installed - Pipe supports are being worked on in this building - We are installing the pipe in tis area. 10 Daniel Ford No 96-MAINTENANCE BUILDING - We laid down the epoxy floor in the lab of the maintenance building 11 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - The conveyor is being installed   MANPOWER LOG 25 Workers  |   192.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland   2 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez     FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 10:16 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Rick Jenne Orlando Cortez Andrew Seleva Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Rafael Alvarado Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 0.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes     FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 10:16 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford       25  192.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    3-31-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental No   10:15AM  00-GENERAL  Notes:Jumping Jack   FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 10:16 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford   7 United Rental No   10:15AM    Notes:Water truck Created By: Daniel Ford   8 AHERN RENTAL 8.0 No   02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   9 No   05:30AM    Notes:Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 45°F 54°F 51°F 0.00 in.0.00 in.0.00 in.75%86%95%47°F 7.1 mph 11 mph 17 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   46°F Partly Cloudy   50°F Partly Cloudy   54°F Clear   55°F Clear   52°F Partly Cloudy   53°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:00:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 10:16 AM PST