Loading...
HomeMy WebLinkAbout2022-04-01FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 4/1/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Tue May 3, 2022 at 09:01amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Watering hydroseed - removing K rail and sand bags - installing waterline at the decor area - clean up and throwing trash away 2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We are working on the pipe supports and welding the Stainless steel plates for this area. - Fabrication, and grinding continues for the support plates 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - angel is being cut for the cassette tank supports - Pipe supports pads - the stainless steel air lines are being pickled 5 Daniel Ford No 60-PRODUCT WATER AREA - We are working on the grout pads and some pipe supports. 6 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install RO supports in the chem area - Layout in this area - Eye wash stations are being installed - Pipe supports are being worked on in this building - We are installing the pipe in tis area. 7 Daniel Ford No 96-MAINTENANCE BUILDING - We laid down the epoxy floor in the lab of the maintenance building   MANPOWER LOG 25 Workers  |   192.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland     FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:29 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Rick Jenne Orlando Cortez Andrew Seleva Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Rafael Alvarado Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking     FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:29 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 0.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Fo Created By:  Daniel Ford       25  192.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    4-1-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift   FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:29 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental No   10:15AM  00-GENERAL  Notes:Jumping Jack Created By: Daniel Ford   7 United Rental No   10:15AM    Notes:Water truck Created By: Daniel Ford   8 AHERN RENTAL 8.0 No   02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   9 No   05:30AM    Notes:Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 08:20AM   Burt Industrial 105521 HOSE    Comments:Created By: Monica Weiss 2 08:20AM   HARRINGTON INDUSTRIAL PLASTICS LLC 12in VSF    Comments:Created By: Monica Weiss 3 08:20AM   HARRINGTON INDUSTRIAL PLASTICS LLC 24in VSF (Incorrect)    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:29 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   4 08:20AM   PACIFIC COAST BOLT CORP 1096224 471-265    Comments:Created By: Monica Weiss 5 08:20AM   HD Supply White Cap 46525778 Pump Hose    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.04.01 Burt Ind Sup 105521 Hose.pdf 2.  2022.04.01 Harrington 12in VSF.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:29 AM PST        3.  2022.04.01 Harrington 24in VSF (Wrong).pdf 4.  2022.04.01 Pac Coast Bolt 1096224 471-265.pdf 5.  2022.04.01 White Cap 46525778 Pump Hose.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 46°F 62°F 54°F 0.00 in.0.00 in.0.00 in.64%85%100%49°F 3.8 mph 9 mph 12 mph   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:29 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   48°F Clear   56°F Clear   63°F Clear   61°F Clear   58°F Clear   52°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 03:05:00 PM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:29 AM PST