Loading...
HomeMy WebLinkAbout2022-04-02FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Saturday 4/2/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue 2 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We are working on the pipe supports and welding the Stainless steel plates for this area. - Fabrication, and grinding continues for the support plates 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - angel is being cut for the cassette tank supports - Pipe supports pads - the stainless steel air lines are being pickled 4 Daniel Ford No 60-PRODUCT WATER AREA - We are working on the grout pads and some pipe supports. 5 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install RO supports in the chem area - Layout in this area - Eye wash stations are being installed - Pipe supports are being worked on in this building - We are installing the pipe in tis area. 6 Daniel Ford No 96-MAINTENANCE BUILDING - We laid down the epoxy floor in the lab of the maintenance building   MANPOWER LOG 16 Workers  |   120.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Daniel Ford   2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz     FBV Morro Bay Joint Venture Page 1 of 4 Printed on 1/24/2023 at 10:31 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER APPRENTICE Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Rick Jenne Orlando Cortez Andrew Seleva Jason Hawthorne Brian Elgin Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Rafael Alvarado Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 0.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    8 1 8.0 8.0     Notes:Cement Mason Apprentices Adolfo Campoverde Created By:  Daniel Ford       16  120.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 2 of 4 Printed on 1/24/2023 at 10:31 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 No   11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental No   10:15AM  00-GENERAL  Notes:Jumping Jack Created By: Daniel Ford   7 United Rental No   10:15AM    Notes:Water truck Created By: Daniel Ford   8 AHERN RENTAL 8.0 No   02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   9 No   05:30AM    Notes:Created By: Daniel Ford     WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 46°F 57°F 51°F 0.00 in.0.00 in.0.00 in.82%91%97%48°F 4.2 mph 8 mph 13 mph   FBV Morro Bay Joint Venture Page 3 of 4 Printed on 1/24/2023 at 10:31 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   47°F Clear   49°F Partly Cloudy   53°F Partly Cloudy   58°F Partly Cloudy   55°F Partly Cloudy   52°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 04:55:00 PM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 4 of 4 Printed on 1/24/2023 at 10:31 AM PST