HomeMy WebLinkAbout2022-04-05FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 4/5/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Watering hydroseed - concrete pour all over the site (small pads, pipe supports and pipe encasements.) - We were working on the chem lines - cleaning concrete off of door and walls - landscaping sub grade continues to be worked on - The painters are starting there coating process in the chemical vaults - Small amount of work the fence guys - all pipes and handrail were wrapped in plastic so williams concrete can come and do there concrete patching 2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue of PVC and CPVC pipes - A small sidewalks was poured at the north and south entrance of this building - a small pad was placed in concrete where the chemical pipes come into the building 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We are working on the pipe supports and welding the Stainless steel plates for this area. - Fabrication, and grinding continues for the support plates - We are setting and anchoring in the pipe supports 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - We cast a pad under the Mixed liquor line for asphalt and to place a pipe support for the 2 20 in lines - Pipe supports pads - the stainless steel air lines are being pickled 5 Daniel Ford No 60-PRODUCT WATER AREA - We are working on the grout pads and some pipe supports. 6 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install RO supports in the chem area - Layout in this area - Eye wash stations are being installed - Pipe supports are being worked on in this building   FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 10:34 AM PST          NOTES LOG    No.Created By Issue?Location Comments   - We encased a sleeve in the 3 inch water line where goes over the conduit underground 7 Daniel Ford No 96-MAINTENANCE BUILDING - We laid down the epoxy floor in the lab of the maintenance building 8 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank   MANPOWER LOG 28 Workers  |   220.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Rick Jenne Orlando Cortez Andrew Seleva Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 10:34 AM PST        No.Contact/Company Workers # Hours Man Hours Location     4 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Rafael Alvarado Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 0.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 10:34 AM PST        No.Contact/Company Workers # Hours Man Hours Location     12 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Rick Howland   13 Parada Painting Inc.2 10.0 20.0     Notes:Vaults Sealed Created By:  Monica Weiss       28  220.0    Manpower Log's Attachments:  12.  ELECTRICRAFT, INC.    4-5-2022 Daily Report.xls   13.  Parada Painting Inc.  0405 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 No   12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 No   05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 No   02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 10:34 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   4 AHERN RENTAL 8.0 No   11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 No   11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental No   10:15AM  00-GENERAL  Notes:Jumping Jack Created By: Daniel Ford   7 United Rental No   10:15AM    Notes:Water truck Created By: Daniel Ford   8 AHERN RENTAL 8.0 No   02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   9 No   05:30AM    Notes:Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 09:10AM   AIRGAS 8122    Comments:Created By: Monica Weiss 2 09:10AM   Cougartron Pickling Polish    Comments:Created By: Monica Weiss 3 09:10AM   HARRINGTON INDUSTRIAL PLASTICS LLC CPVC    Comments:Created By: Monica Weiss 4 09:10AM   Multi W Systems Cover Grease Fasteners    Comments:Created By: Monica Weiss 5 09:10AM   HD Supply White Cap 46564009 Hose    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 10:34 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   6 09:10AM   HD Supply White Cap 4661935 Sikaflex    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.04.05 Airgas 8122.pdf 2.  2022.04.05 Cougartron Pickling Polish.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 10:34 AM PST        3.  2022.04.05 Harrington CPVC.pdf 4.  2022.04.05 Multi W Systems cover grease fasteners.pdf 5.  2022.04.05 White Cap 46564009 Hose.pdf   FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 10:34 AM PST        6.  2022.04.05 White Cap Sikaflex 4661935.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 64°F 56°F 0.00 in.0.00 in.0.00 in.39%75%91%48°F 6.0 mph 8 mph 14 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   55°F Clear   61°F Clear   58°F Clear   59°F Clear   58°F Clear   54°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:45:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 10:34 AM PST