Loading...
HomeMy WebLinkAbout2022-04-08FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 4/8/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Watering hydroseed - we are cleaning the entrance area - Manholes are being cleaned out. - landscaping sub grade continues to be worked on - The painters are starting there coating process in the chemical vaults - We had a plug in one of the man holes and we had to chip out some slurry and clean out gravel to clear it 2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue of PVC and CPVC pipes - We are installing supports in this building. 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We are setting and anchoring in the pipe supports - Williams Concrete is sacking the southern wall of the BNR tank. 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Pipe supports pads are being worked on and drilled and anchored into place - All the diffuser blowers are up and running. 5 Daniel Ford No 60-PRODUCT WATER AREA - We are working on the grout pads and some pipe supports. 6 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install RO supports in the chem area - Piping continues to be installed in this area. - Pipe supports are being worked on in this building 7 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Pipe supports are being worked on in this area - Water is not draining from the northern tank, so we are pumping it out to investigate the situation.   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:36 AM PST          MANPOWER LOG 25 Workers  |   192.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland   2 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Javier Trevino Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Rick Jenne Orlando Cortez Andrew Seleva Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Rafael Alvarado Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:36 AM PST        No.Contact/Company Workers # Hours Man Hours Location     6 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 0.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford    12 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford       25  192.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    4-8-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:36 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   7 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   8 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 09:50AM   Allied Steel Co., Inc.Steel Galv ANgles    Comments:Created By: Monica Weiss 2 09:50AM   Ferguson Enterprises, LLC 1.5 VSF    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:36 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   3 09:50AM   Allied Steel Co., Inc.Grating Pacific    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.04.08 Allied Steel Galv Angles.pdf 2.  2022.04.08 Ferguson 1.5 VSF.pdf   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:36 AM PST        3.  2022.04.08 Grating Pacific Allied.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 54°F 84°F 69°F 0.00 in.0.00 in.0.00 in.29%47%82%46°F 3.5 mph 5 mph 12 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   74°F Clear   77°F Clear   85°F Clear   76°F Clear   67°F Cloudy   58°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:40:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:36 AM PST