Loading...
HomeMy WebLinkAbout2022-04-11FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 4/11/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Tue May 3, 2022 at 10:24amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Watering hydroseed - The top 2 sections of the Manhole near the Vacor pad were removed and barricaded off so we can build a interior weir wall inside. - Manholes are being cleaned out. - landscaping sub grade continues to be worked on - General clean up around site - We are filing tanks all over the job BNR,SHT, Product water tank, outfall balance tank 2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue of PVC and CPVC pipes - We are installing supports in this building. - We are installing the 2" pipe and a valve in this area. - Air vac was installed in this area - Chemical injection quills are being installed 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We are setting and anchoring in the pipe supports 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Pipe supports pads are being worked on and drilled and anchored into place - All the diffuser blowers are up and running. (SUEZ continues with there testing) - The chemical quills are being installed in the RO feed area - Piping continues to be installed for the cassette tank - We are setting up for the commission test at the cassette tank. 5 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install the 1 1/2 inch cs lines in this area - Piping continues to be installed in this area. - Pipe supports are being worked on in this building   FBV Morro Bay Joint Venture Page 1 of 9 Printed on 1/24/2023 at 10:37 AM PST          NOTES LOG    No.Created By Issue?Location Comments   6 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Pipe supports are being worked on in this area - Water is not draining from the northern tank, so we are pumping it out to investigate the situation. 7 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown - We are digging around the 6 inch drain line in the bottom of the vacor pad. 8 Daniel Ford No 60-PRODUCT WATER AREA - Supports are being installed for the outfall area. - Air vac was installed in this area 9 Daniel Ford No 95-OPERATIONS BUILDING - We are taking care of concrete punch list items in this building (4,25,38,41,52 and 57) - We took care of punch list items for 1,2,5,18,26,27, 45, and 47   MANPOWER LOG 27 Workers  |   212.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Esteban Zamudio Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS     FBV Morro Bay Joint Venture Page 2 of 9 Printed on 1/24/2023 at 10:37 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Coy is brite Orlando Cortez Andrew Seleva Created By:  Daniel Ford  4 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Rafael Alvarado Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 0.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 3 of 9 Printed on 1/24/2023 at 10:37 AM PST        No.Contact/Company Workers # Hours Man Hours Location     11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    12 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland   13 Parada Painting Inc.2 10.0 20.0 70-RESIDUALS AREA     Notes:Created By:  Monica Weiss      27  212.0    Manpower Log's Attachments:  12.  ELECTRICRAFT, INC.    4-11-2022 Daily Report.xls   13.  Parada Painting Inc.  0411 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 9 Printed on 1/24/2023 at 10:37 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   7 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   8 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 10:05AM   Airgas Welding Harness    Comments:Created By: Monica Weiss 2 10:05AM   B & B Steel Supply w AIS Angle Brackets    Comments:Created By: Monica Weiss 3 10:05AM   Burt Industrial 106046 Fire Hose    Comments:Created By: Monica Weiss 4 10:05AM   Zima Corporation Stairs    Comments:Created By: Monica Weiss 5 10:05AM   PRW Steel 471-270 Flat Bar    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 5 of 9 Printed on 1/24/2023 at 10:37 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   6 10:05AM   PRW Steel SQ Tube    Comments:Created By: Monica Weiss 7 10:05AM   HD Supply White Cap 46661935 SAFETY    Comments:Created By: Monica Weiss 8 10:05AM   HD Supply White Cap 46706690 Set 3 orientation    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.04.11 Airgas Welding Harness.pdf 2.  2022.04.11 B N B Steel Supply AIS MW.pdf   FBV Morro Bay Joint Venture Page 6 of 9 Printed on 1/24/2023 at 10:37 AM PST        3.  2022.04.11 Burt Industrial Supply Fire Hose 106046.pdf 4.  2022.04.11 Kusters Zima Stairs.pdf 5.  2022.04.11 Prw Steel 471-270 Flat Bar.pdf   FBV Morro Bay Joint Venture Page 7 of 9 Printed on 1/24/2023 at 10:37 AM PST        6.  2022.04.11 PRW Steel SQ Tube Galv.pdf 7.  2022.04.11 White Cap 46661935 Safety.pdf 8.  2022.04.11 White Cap 46706690 Set 3G.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 45°F 54°F 50°F 0.01 in.0.01 in.0.01 in.53%75%90%42°F 7.9 mph 16 mph 28 mph   FBV Morro Bay Joint Venture Page 8 of 9 Printed on 1/24/2023 at 10:37 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   45°F Clear   53°F Partly Cloudy   53°F Partly Cloudy   53°F Clear   52°F Clear   49°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:45:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 9 of 9 Printed on 1/24/2023 at 10:37 AM PST