HomeMy WebLinkAbout2022-04-12FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Tuesday 4/12/2022
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Watering hydroseed
- The top 2 sections of the Manhole near the Vacor pad were
removed and barricaded off so we can build a interior weir
wall inside.
- Manholes are being cleaned out.
- landscaping sub grade continues to be worked on
- General clean up around site
- We are filing tanks all over the job BNR,SHT, Product water
tank, outfall balance tank
2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue of PVC and CPVC pipes
- We are installing supports in this building.
- We are installing the 2" pipe and a valve in this area.
- Air vac was installed in this area
- Chemical injection quills are being installed
3 Daniel Ford No 30-TREATMENT AREA>31-
Treatment Area - BNR
Basins
- We are setting and anchoring in the pipe supports
4 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- Pipe supports pads are being worked on and drilled and
anchored into place
- All the diffuser blowers are up and running. (SUEZ continues
with there testing)
- The chemical quills are being installed in the RO feed area
- Piping continues to be installed for the cassette tank
- We are setting up for the commission test at the cassette
tank.
5 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install the 1 1/2 inch cs lines in this area
- Piping continues to be installed in this area.
- Pipe supports are being worked on in this building
FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:38 AM PST
NOTES LOG
No.Created By Issue?Location Comments
6 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
- Pipe supports are being worked on in this area
- Water is not draining from the northern tank, so we are
pumping it out to investigate the situation.
7 Daniel Ford No 20-HEADWORKS AREA>24-
Headworks Area - Vactor
Washdown
- We are digging around the 6 inch drain line in the bottom of
the vacor pad.
8 Daniel Ford No 60-PRODUCT WATER AREA - Supports are being installed for the outfall area.
- Air vac was installed in this area
9 Daniel Ford No 95-OPERATIONS
BUILDING
- We are taking care of concrete punch list items in this
building (4,25,38,41,52 and 57)
- We took care of punch list items for 1,2,5,18,26,27, 45, and 47
MANPOWER LOG 27 Workers | 212.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Charlie Gonzales
Angel Diaz
Norman Gularte
Daniel Waddle
Manny Hernandez
Esteban Zamudio
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:LABORER APPRENTICE
Teddy Maldonado
Javier Trevino
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:38 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Coy is brite
Orlando Cortez
Andrew Seleva
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL
Notes:CARPENTER APPRENTICE
Micha Pixley
Enrique Padilla
Rafael Alvarado
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL
Notes:Certified Welder Pipefitter
Rick Dayton
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Kyle Brooking
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Cement Mason
Daniel Sheslingoff
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 0.0 0.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter Foreman
Phil Lacey
Created By: Daniel Ford
10 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Cement Masons
Adolfo Campoverde
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:38 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
11 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
12 ELECTRICRAFT, INC.5 8.0 40.0
Notes:Created By: Rick Howland
13 Parada Painting Inc.2 10.0 20.0
Notes:Created By: Monica Weiss
27 212.0
Manpower Log's Attachments:
12. ELECTRICRAFT, INC.
4-12-2022 Daily Report.xls
13. Parada Painting Inc.
0412 PARADA STA (2).pdf
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 Yes 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
2 AHERN RENTAL 8.0 Yes 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:38 AM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
3 AHERN RENTAL 8.0 Yes 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 Yes 11:25AM 00-GENERAL
Notes:Skid steer
Created By: Daniel Ford
5 United Rental 8.0 Yes 11:25AM 00-GENERAL
Notes:loader
Created By: Daniel Ford
6 United Rental Yes 10:15AM
Notes:Water truck
Created By: Daniel Ford
7 AHERN RENTAL 8.0 Yes 02:10PM
Notes:35' Ariel lift
Created By: Daniel Ford
8 AHERN RENTAL 8.0 Yes 05:30AM
Notes:Mini Excavator
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 10:20AM Miner's Ace Hardware 735073 Misc Consumables
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:38 AM PST
1.
2022.04.12 Miners 735073 Misc Cons.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
42°F 55°F 48°F 0.00 in.0.01 in.0.01 in.33%58%72%34°F 8.3 mph 17 mph 29 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
44°F
Clear
49°F
Clear
54°F
Clear
54°F
Clear
52°F
Clear
49°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 12:50:00 PM No
By Date Copies To
FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:38 AM PST