HomeMy WebLinkAbout2022-04-12FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 4/12/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Watering hydroseed - The top 2 sections of the Manhole near the Vacor pad were removed and barricaded off so we can build a interior weir wall inside. - Manholes are being cleaned out. - landscaping sub grade continues to be worked on - General clean up around site - We are filing tanks all over the job BNR,SHT, Product water tank, outfall balance tank 2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue of PVC and CPVC pipes - We are installing supports in this building. - We are installing the 2" pipe and a valve in this area. - Air vac was installed in this area - Chemical injection quills are being installed 3 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - We are setting and anchoring in the pipe supports 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Pipe supports pads are being worked on and drilled and anchored into place - All the diffuser blowers are up and running. (SUEZ continues with there testing) - The chemical quills are being installed in the RO feed area - Piping continues to be installed for the cassette tank - We are setting up for the commission test at the cassette tank. 5 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install the 1 1/2 inch cs lines in this area - Piping continues to be installed in this area. - Pipe supports are being worked on in this building   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:38 AM PST          NOTES LOG    No.Created By Issue?Location Comments   6 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Pipe supports are being worked on in this area - Water is not draining from the northern tank, so we are pumping it out to investigate the situation. 7 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown - We are digging around the 6 inch drain line in the bottom of the vacor pad. 8 Daniel Ford No 60-PRODUCT WATER AREA - Supports are being installed for the outfall area. - Air vac was installed in this area 9 Daniel Ford No 95-OPERATIONS BUILDING - We are taking care of concrete punch list items in this building (4,25,38,41,52 and 57) - We took care of punch list items for 1,2,5,18,26,27, 45, and 47   MANPOWER LOG 27 Workers  |   212.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Esteban Zamudio Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS     FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:38 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Coy is brite Orlando Cortez Andrew Seleva Created By:  Daniel Ford  4 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley Enrique Padilla Rafael Alvarado Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL     Notes:Certified Welder Pipefitter Rick Dayton Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 0.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Foreman Phil Lacey Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:38 AM PST        No.Contact/Company Workers # Hours Man Hours Location     11 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    12 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland   13 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss      27  212.0    Manpower Log's Attachments:  12.  ELECTRICRAFT, INC.    4-12-2022 Daily Report.xls   13.  Parada Painting Inc.  0412 PARADA STA (2).pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:38 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   7 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   8 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 10:20AM   Miner's Ace Hardware 735073 Misc Consumables    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:38 AM PST        1.  2022.04.12 Miners 735073 Misc Cons.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 42°F 55°F 48°F 0.00 in.0.01 in.0.01 in.33%58%72%34°F 8.3 mph 17 mph 29 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   44°F Clear   49°F Clear   54°F Clear   54°F Clear   52°F Clear   49°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 12:50:00 PM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:38 AM PST