HomeMy WebLinkAbout2022-04-15FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 4/15/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Wed May 4, 2022 at 10:32amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Watering hydroseed - landscaping sub grade continues to be worked on - General clean up around site.We are gathering up all rebar and removing all big rocks and concrete spoils in al landscape areas - Jobsite clean up - Installing drain line and backfill outside of the chemical building _ working on BMP and getting ready for possible rain over the weekemd 2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue of PVC and CPVC pipes - Fab and install the analyzer line - Chemical injection quills are being installed 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Pipe supports for the tanks and drilling for anchors - SUEZ continues with there testing - The chemical quills are being installed in the RO feed area 4 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install the 1 1/2 inch cs lines in this area - Piping continues to be installed in this area. - Pipe supports are being worked on in this building 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Pipe supports are being worked on in this area 6 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown - We are digging around the 6 inch drain line in the bottom of the vacor pad.   FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 10:39 AM PST          NOTES LOG    No.Created By Issue?Location Comments   7 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown - We are building a weir wall in the vanhole directly after the vacor pad 8 Daniel Ford No 96-MAINTENANCE BUILDING - Punch list - Concrete items are being worked on today   MANPOWER LOG 22 Workers  |   127.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 5.0 25.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Norman Gularte Daniel Waddle Manny Hernandez Esteban Zamudio Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.2 6.0 12.0 00-GENERAL     Notes:LABORER APPRENTICE Teddy Maldonado Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.2 4.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Andrew Seleva Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.3 5.0 15.0 00-GENERAL     Notes:CARPENTER APPRENTICE Micha Pixley     FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 10:39 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Enrique Padilla Rafael Alvarado Created By:  Daniel Ford  5 J.R. Filanc Construction Company, Inc.2 6.0 12.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 5.0 5.0     Notes:Cement Mason Daniel Sheslingoff Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 5.0 5.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 5.0 5.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    10 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland      22  127.0    Manpower Log's Attachments:  10.  ELECTRICRAFT, INC.    4-15-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 10:39 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   7 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   8 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 10:25AM   Airgas 3238 Misc. Weld    Comments:Created By: Monica Weiss 2 10:25AM   Airgas 6783 Helium    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 10:39 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   3 10:25AM   Ferguson Enterprises, LLC drain Grates    Comments:Created By: Monica Weiss 4 10:25AM   HARRINGTON INDUSTRIAL PLASTICS LLC solenoid valve    Comments:Created By: Monica Weiss 5 10:25AM   Miner's Ace Hardware Tools    Comments:Created By: Monica Weiss 6 10:25AM   Miner's Ace Hardware 735390 Replacement Tools    Comments:Created By: Monica Weiss 7 10:25AM   Suez Water Technologies & Solutions ANtenna    Comments:Created By: Monica Weiss 8 10:25AM   HD Supply White Cap 46661935 Water SAFETY    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.04.15 Airgas 3238 Misc Weld.pdf   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 10:39 AM PST        2.  2022.04.15 Airgas 6783 Helium.pdf 3.  2022.04.15 Ferguson Drain Grates.pdf 4.  2022.04.15 Harrington ASCO Solenoid Vlv.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 10:39 AM PST        5.  2022.04.15 Miner Tools.pdf 6.  2022.04.15 Miners 735390 Replacement To0ls.pdf 7.  2022.04.15 Suez antenna.pdf   FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 10:39 AM PST        8.  2022.04.15 White Cap 46661935 Water.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 44°F 59°F 51°F 0.00 in.0.00 in.0.00 in.71%86%98%47°F 4.8 mph 10 mph 13 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   45°F Clear   53°F Partly Cloudy   59°F Cloudy   58°F Cloudy   54°F Cloudy   50°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 10:39 AM PST