Loading...
HomeMy WebLinkAbout2022-04-18FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 4/18/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Wed May 4, 2022 at 10:39amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Watering hydroseed - landscaping sub grade continues to be worked on - Installing drain line and backfill outside of the chemical building 2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue of PVC and CPVC pipes - Fab and install the analyzer line - Chemical injection quills are being installed 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Pipe supports for the tanks and drilling for anchors - SUEZ continues with there testing - The chemical quills are being installed in the RO feed area 4 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install the 1 1/2 inch cs lines in this area - Piping continues to be installed in this area. - Pipe supports are being worked on in this building 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Pipe supports are being worked on in this area 6 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown - We are digging around the 6 inch drain line in the bottom of the vacor pad. 7 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown - We are building a weir wall in the vanhole directly after the vacor pad 8 Daniel Ford No 96-MAINTENANCE BUILDING - Punch list - Concrete items are being worked on today   FBV Morro Bay Joint Venture Page 1 of 9 Printed on 1/24/2023 at 10:40 AM PST          MANPOWER LOG 17 Workers  |   127.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Daniel Waddle Manny Hernandez Esteban Zamudio Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER APPRENTICE Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 7.0 7.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Andrew Seleva Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE Rafael Alvarado Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.2 6.0 12.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.0 5.0 0.0     Notes:Created By:  Daniel Ford     FBV Morro Bay Joint Venture Page 2 of 9 Printed on 1/24/2023 at 10:40 AM PST        No.Contact/Company Workers # Hours Man Hours Location     7 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    10 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland   11 DLG Contractors 1 4.0 4.0 95-OPERATIONS BUILDING     Notes:Punch List Items Created By:  Monica Weiss       17  127.0    Manpower Log's Attachments:  10.  ELECTRICRAFT, INC.    4-18-2022 Daily Report.xls   11.  DLG Contractors  20220422140257862.pdf   FBV Morro Bay Joint Venture Page 3 of 9 Printed on 1/24/2023 at 10:40 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   7 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   8 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 10:30AM   airgas 2558    Comments:Created By: Monica Weiss 2 10:30AM   Airgas 2611    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 9 Printed on 1/24/2023 at 10:40 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   3 10:30AM   CS - AMSCO DEZURIK 14" Butterfly Valve    Comments:Created By: Monica Weiss 4 10:30AM   Ferguson Enterprises, LLC A60 CPVC    Comments:Created By: Monica Weiss 5 10:30AM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-276 A90 PVC/CPVC    Comments:Created By: Monica Weiss 6 10:30AM   THE HOME DEPOT 5230222 RAKE    Comments:Created By: Monica Weiss 7 10:30AM   Miner's Ace Hardware 735520 Wet Dry Vac and MOP    Comments:Created By: Monica Weiss 8 10:30AM   NEGRANTI & SONS 33560    Comments:Created By: Monica Weiss 9 10:30AM   TRI STAR INDUSTRIAL LLC MBR Insulation Saddles    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.04.18 Airgas 2558.pdf   FBV Morro Bay Joint Venture Page 5 of 9 Printed on 1/24/2023 at 10:40 AM PST        2.  2022.04.18 Airgas 2611.pdf 3.  2022.04.18 Dezurik CSAmSCO 14in BFV.pdf 4.  2022.04.18 Ferguson A60 CPVC.pdf   FBV Morro Bay Joint Venture Page 6 of 9 Printed on 1/24/2023 at 10:40 AM PST        5.  2022.04.18 Harrington A90 471-276.pdf 6.  2022.04.18 Home Depot 5230222 Rake.pdf 7.  2022.04.18 Miners 735520 WetDRY Mop.pdf   FBV Morro Bay Joint Venture Page 7 of 9 Printed on 1/24/2023 at 10:40 AM PST        8.  2022.04.18 Negranti 33560.pdf 9.  2022.04.18 Tri-Star MBR Insulation Saddles.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 44°F 55°F 50°F 0.00 in.0.00 in.0.08 in.69%84%94%46°F 4.7 mph 8 mph 14 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   44°F Partly Cloudy   49°F Partly Cloudy   53°F Partly Cloudy   56°F Partly Cloudy   55°F Partly Cloudy   53°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:45:00 AM No     FBV Morro Bay Joint Venture Page 8 of 9 Printed on 1/24/2023 at 10:40 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 9 of 9 Printed on 1/24/2023 at 10:40 AM PST