Loading...
HomeMy WebLinkAbout2022-04-19FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 4/19/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Wed May 4, 2022 at 03:40pmPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Watering hydroseed - landscaping sub grade continues to be worked on - Installing drain line and backfill outside of the chemical building - We poured the weir wall in manhole 1 2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue of PVC and CPVC pipes - Fab and install the analyzer line - Chemical injection quills are being installed 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Pipe supports for the tanks and drilling for anchors - SUEZ continues with there testing - The chemical quills are being installed in the RO feed area - Misc small pads were poured around this slab today. - Commissioning pumps and valves at the MBR slab 4 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install the 1 1/2 inch cs lines in this area - Piping continues to be installed in this area. - Pipe supports are being worked on in this building - We are working on the 2" containment 5 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Pipe supports are being worked on in this area 6 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown - We are digging around the 6 inch drain line in the bottom of the vacor pad.   FBV Morro Bay Joint Venture Page 1 of 9 Printed on 1/24/2023 at 10:40 AM PST          NOTES LOG    No.Created By Issue?Location Comments   7 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown - We are building a weir wall in the vanhole directly after the vacor pad 8 Daniel Ford No 96-MAINTENANCE BUILDING - Punch list - Concrete items are being worked on today 9 Daniel Ford No 20-HEADWORKS AREA - We assisted Kusters with the insulation and removal of the 4 staircases   MANPOWER LOG 19 Workers  |   151.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Daniel Waddle Manny Hernandez Esteban Zamudio Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER APPRENTICE Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 7.0 7.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Andrew Seleva Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE     FBV Morro Bay Joint Venture Page 2 of 9 Printed on 1/24/2023 at 10:40 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Rafael Alvarado Created By:  Daniel Ford  5 J.R. Filanc Construction Company, Inc.2 6.0 12.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    9 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland   10 Parada Painting Inc.2 10.0 20.0 60-PRODUCT WATER AREA>62- Product Water - IPR Product Water Storage Tank     Notes:Pipes IPR Created By:  Monica Weiss       19  151.0    Manpower Log's Attachments:  9.  ELECTRICRAFT, INC.    4-19-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 9 Printed on 1/24/2023 at 10:40 AM PST        10.  Parada Painting Inc.  0419 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   7 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   8 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator   FBV Morro Bay Joint Venture Page 4 of 9 Printed on 1/24/2023 at 10:40 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford   Equipment Log's Attachments: 8.  2022.04.19 AHern Excavator Gas Trench.pdf   DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 10:40AM   CalPortland 9505    Comments:Created By: Monica Weiss 2 10:40AM   Fastenal 0587    Comments:Created By: Monica Weiss 3 10:40AM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-279 2in cpvc    Comments:Created By: Monica Weiss 4 10:40AM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-279 FRP    Comments:Created By: Monica Weiss 5 10:40AM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-279    Comments:Created By: Monica Weiss 6 10:40AM   HARRINGTON INDUSTRIAL PLASTICS LLC Dechlor Flange    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 5 of 9 Printed on 1/24/2023 at 10:40 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   7 10:40AM   Miner's Ace Hardware 735706 2in PVC    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.04.19 Calportland 9505.pdf 2.  2022.04.19 Fastenal 0587.pdf   FBV Morro Bay Joint Venture Page 6 of 9 Printed on 1/24/2023 at 10:40 AM PST        3.  2022.04.19 Harrington 471-279 2in CPVC Pipe.pdf 4.  2022.04.19 Harrington 471-279 FRP.pdf 5.  2022.04.19 Harrington 471-279 FRP2.pdf   FBV Morro Bay Joint Venture Page 7 of 9 Printed on 1/24/2023 at 10:40 AM PST        6.  2022.04.19 Harrington Dechlor Flange.pdf 7.  2022.04.19 Miners 735706 2in pvc .pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 59°F 54°F 0.00 in.0.00 in.0.00 in.77%87%95%51°F 4.5 mph 7 mph 13 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   54°F Partly Cloudy   57°F Partly Cloudy   60°F Partly Cloudy   57°F Partly Cloudy   55°F Partly Cloudy   51°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No     FBV Morro Bay Joint Venture Page 8 of 9 Printed on 1/24/2023 at 10:40 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 9 of 9 Printed on 1/24/2023 at 10:40 AM PST