Loading...
HomeMy WebLinkAbout2022-04-20FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 4/20/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Wed May 4, 2022 at 03:42pmPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - landscaping sub grade continues to be worked on - Installing drain line and backfill outside of the chemical building - We are stripping out the formwork the weir wall in manhole 1 - Cleaning out manholes and working with the cement mason in the chemical - We were moving water around for testing and supporting the pump testing - Enrique was helping in the office 2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue of PVC and CPVC pipes - Fab and install the analyzer line - Chemical injection quills are being installed 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Pipe supports for the tanks and drilling for anchors - SUEZ continues with there testing - The chemical quills are being installed in the RO feed area - Misc small pads were being stripped and cleaned today - Commissioning pumps and valves at the MBR slab 4 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install the 1 1/2 inch cs lines in this area - Piping continues to be installed in this area. - Pipe supports are being worked on in this building - We are working on the 2" containment - We are working on the supports 5 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown - We are digging around the 6 inch drain line in the bottom of the vacor pad.   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:40 AM PST          NOTES LOG    No.Created By Issue?Location Comments   6 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown - We stripped out the form work and cleaned out manhole 1 7 Daniel Ford No 96-MAINTENANCE BUILDING - Punch list - Concrete items are being worked on today 8 Daniel Ford No 20-HEADWORKS AREA - Kusters finished spraying the acid wash wash. Packed up there stuff and left.   MANPOWER LOG 20 Workers  |   159.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Daniel Waddle Manny Hernandez Esteban Zamudio Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER APPRENTICE Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 7.0 7.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Andrew Seleva Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE     FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:40 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Rafael Alvarado Created By:  Daniel Ford  5 J.R. Filanc Construction Company, Inc.2 6.0 12.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    10 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland   11 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss      20  159.0    Manpower Log's Attachments:  10.  ELECTRICRAFT, INC.    4-20-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:40 AM PST        11.  Parada Painting Inc.  0420 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   7 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   8 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:40 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 03:40PM   HD Supply White Cap 3931 Slings    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.04.20 White Cap slings 3931.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 46°F 57°F 52°F 0.00 in.0.00 in.0.00 in.68%83%94%47°F 4.7 mph 8 mph 13 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   46°F Clear   54°F Clear   55°F Clear   58°F Clear   56°F Clear   54°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea     FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:40 AM PST          OBSERVED WEATHER CONDITIONS 1 05:45:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:40 AM PST