Loading...
HomeMy WebLinkAbout2022-04-22FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 4/22/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Thu May 5, 2022 at 10:11amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - landscaping sub grade continues to be worked on - Installing drain line and backfill outside of the chemical building - The weir wall at manhole 1 is complete and everything has been cleaned and put back together - Cleaning out manholes and working with the cement mason in the chemical - We were moving water around for testing and supporting the pump testing - Rain event 2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue of PVC and CPVC pipes - Fab and install the analyzer line - Chemical injection quills are being installed 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Pipe supports for the tanks and drilling for anchors - SUEZ continues with there testing - The chemical quills are being installed in the RO feed area - Commissioning pumps and valves at the MBR slab 4 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install the 1 1/2 inch cs lines in this area - Piping continues to be installed in this area. - Pipe supports are being worked on in this building - We are working on the 2" containment - We are working on the supports - Big Wachoo Had 2 guys working on the fencing around this building today - Eye wash stations are being installed 5 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown - Some patch work and cleaning in MH 1   FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:42 AM PST          NOTES LOG    No.Created By Issue?Location Comments   6 Daniel Ford No 96-MAINTENANCE BUILDING - Punch list - Concrete items are being worked on today   MANPOWER LOG 21 Workers  |   164.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.5 8.0 40.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Daniel Waddle Manny Hernandez Esteban Zamudio Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER APPRENTICE Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Andrew Seleva Coy Brite Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:CARPENTER APPRENTICE Rafael Alvarado Erique Padilla Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:42 AM PST        No.Contact/Company Workers # Hours Man Hours Location     5 J.R. Filanc Construction Company, Inc.2 6.0 12.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    10 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland      21  164.0    Manpower Log's Attachments:  10.  ELECTRICRAFT, INC.    4-22-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:42 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   7 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   8 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 03:55PM   CAPITAL FLOW INC RETURN Pick up from C&B Piping    Comments:Created By: Monica Weiss 2 03:55PM   HARRINGTON INDUSTRIAL PLASTICS LLC 24in Spigot    Comments:Created By: Monica Weiss 3 03:55PM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-277 Coupling    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:42 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   4 03:55PM   HARRINGTON INDUSTRIAL PLASTICS LLC FRP Clamps    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.04.22 Capflo Return C&B.pdf 2.  2022.04.22 Harrington 24in Spigot.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:42 AM PST        3.  2022.04.22 Harrington 471-277 Coupling.pdf 4.  2022.04.22 Harrington FRP Clamps.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 48°F 57°F 52°F 0.09 in.0.34 in.0.34 in.70%84%97%47°F 5.1 mph 13 mph 18 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Cloudy   49°F Partly Cloudy   53°F Clear   55°F Partly Cloudy   57°F Clear   56°F Clear   51°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No     FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:42 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:42 AM PST