HomeMy WebLinkAbout2022-04-25FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 4/25/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Thu May 5, 2022 at 10:14amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Excavating across the road in the front. (We have traffic control setup as well as steel plates) - Installing drain line and backfill outside of the chemical building - We were moving water around for testing and supporting the pump testing - We are backfilling behind the chemical building - Jobsite clean up - Watering hydroseed 2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue of PVC and CPVC pipes - Fab and install the analyzer line - Chemical injection quills are being installed 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Pipe supports for the tanks and drilling for anchors - SUEZ continues with there testing - The chemical quills are being installed in the RO feed area - Commissioning pumps and valves at the MBR slab 4 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install the 1 1/2 inch cs lines in this area - Piping continues to be installed in this area. - Pipe supports are being worked on in this building - We are working on the 2" containment - We are working on the supports - Big Wachoo Had 2 guys working on the fencing around this building today - Eye wash stations are being installed 5 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown - We cleaned out the channel on the east end and snapped out a pour line   FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:43 AM PST          NOTES LOG    No.Created By Issue?Location Comments   6 Daniel Ford No 96-MAINTENANCE BUILDING - Punch list - Concrete items are being worked on today 7 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank -Water is being pumped out of the north and south tanks 8 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - We were working on the anchors for the Conveyor today   MANPOWER LOG 19 Workers  |   148.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Daniel Waddle Manny Hernandez Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER APPRENTICE Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE     FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:43 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Rafael Alvarado Created By:  Daniel Ford  5 J.R. Filanc Construction Company, Inc.2 6.0 12.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    11 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland      19  148.0    Manpower Log's Attachments:  11.  ELECTRICRAFT, INC.    FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:43 AM PST          4-25-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   7 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   8 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 10:10AM   Aqua-Aerobic Systems, Inc.Paint    Comments:Created By: Monica Weiss 2 10:10AM   CAPITAL FLOW INC 13278 ARV    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:43 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   3 10:10AM   Ferguson Enterprises, LLC 9898735 471-281 A90    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.04.25 Aqua Aerobics Paint.pdf 2.  2022.04.25 Capflo 13278 ARV.pdf   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:43 AM PST        3.  2022.04.25 Ferguson 9898735 471-281_A90.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 51°F 62°F 55°F 0.00 in.0.00 in.0.00 in.62%76%89%48°F 5.1 mph 7 mph 12 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   52°F Partly Cloudy   59°F Partly Cloudy   60°F Partly Cloudy   61°F Partly Cloudy   58°F Partly Cloudy   53°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:00:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:43 AM PST