HomeMy WebLinkAbout2022-04-25FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Monday 4/25/2022
Daily Log Completed
The Daily Log was completed by Monica Weiss on Thu May 5, 2022 at 10:14amPDT.
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Excavating across the road in the front. (We have traffic
control setup as well as steel plates)
- Installing drain line and backfill outside of the chemical
building
- We were moving water around for testing and supporting
the pump testing
- We are backfilling behind the chemical building
- Jobsite clean up
- Watering hydroseed
2 Daniel Ford No 50-RO/UV BUILDING - Fabrication and installation continue of PVC and CPVC pipes
- Fab and install the analyzer line
- Chemical injection quills are being installed
3 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- Pipe supports for the tanks and drilling for anchors
- SUEZ continues with there testing
- The chemical quills are being installed in the RO feed area
- Commissioning pumps and valves at the MBR slab
4 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install the 1 1/2 inch cs lines in this area
- Piping continues to be installed in this area.
- Pipe supports are being worked on in this building
- We are working on the 2" containment
- We are working on the supports
- Big Wachoo Had 2 guys working on the fencing around this
building today
- Eye wash stations are being installed
5 Daniel Ford No 20-HEADWORKS AREA>24-
Headworks Area - Vactor
Washdown
- We cleaned out the channel on the east end and snapped out
a pour line
FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:43 AM PST
NOTES LOG
No.Created By Issue?Location Comments
6 Daniel Ford No 96-MAINTENANCE
BUILDING
- Punch list
- Concrete items are being worked on today
7 Daniel Ford No 70-RESIDUALS AREA>71-
Residuals Area - Sludge
Holding Tanks & SAFE
Settle Tank
-Water is being pumped out of the north and south tanks
8 Daniel Ford No 70-RESIDUALS AREA>72-
Residuals Area -
Dewatering Facility
- We were working on the anchors for the Conveyor today
MANPOWER LOG 19 Workers | 148.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Charlie Gonzales
Angel Diaz
Daniel Waddle
Manny Hernandez
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:LABORER APPRENTICE
Javier Trevino
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Coy Brite
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:CARPENTER APPRENTICE
FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:43 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Rafael Alvarado
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.2 6.0 12.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Kyle Brooking
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Cement Masons
Adolfo Campoverde
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
9 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
10 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
11 ELECTRICRAFT, INC.5 8.0 40.0
Notes:Created By: Rick Howland
19 148.0
Manpower Log's Attachments:
11. ELECTRICRAFT, INC.
FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:43 AM PST
4-25-2022 Daily Report.xls
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 Yes 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
2 AHERN RENTAL 8.0 Yes 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
3 AHERN RENTAL 8.0 Yes 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 Yes 11:25AM 00-GENERAL
Notes:Skid steer
Created By: Daniel Ford
5 United Rental 8.0 Yes 11:25AM 00-GENERAL
Notes:loader
Created By: Daniel Ford
6 United Rental Yes 10:15AM
Notes:Water truck
Created By: Daniel Ford
7 AHERN RENTAL 8.0 Yes 02:10PM
Notes:35' Ariel lift
Created By: Daniel Ford
8 AHERN RENTAL 8.0 Yes 05:30AM
Notes:Mini Excavator
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 10:10AM Aqua-Aerobic Systems, Inc.Paint
Comments:Created By: Monica Weiss
2 10:10AM CAPITAL FLOW INC 13278 ARV
Comments:Created By: Monica Weiss
FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:43 AM PST
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
3 10:10AM Ferguson Enterprises, LLC 9898735 471-281 A90
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.04.25 Aqua Aerobics Paint.pdf
2.
2022.04.25 Capflo 13278 ARV.pdf
FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:43 AM PST
3.
2022.04.25 Ferguson 9898735 471-281_A90.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
51°F 62°F 55°F 0.00 in.0.00 in.0.00 in.62%76%89%48°F 5.1 mph 7 mph 12 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
52°F
Partly Cloudy
59°F
Partly Cloudy
60°F
Partly Cloudy
61°F
Partly Cloudy
58°F
Partly Cloudy
53°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 06:00:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:43 AM PST