Loading...
HomeMy WebLinkAbout2022-04-27FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 4/27/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Thu May 5, 2022 at 11:22amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Excavating across the road in the front for the gas line. (We have traffic control setup as well as steel plates) - We were moving water around for testing and supporting the pump testing - Jobsite clean up - Watering hydroseed - landscaping sub grade continues - The Cement Masons are working on all vaults and concrete that touch the asphalt 2 Daniel Ford No 50-RO/UV BUILDING - We are working on the 8 inch valves - Fab and install the analyzer line - Chemical injection quills are being installed - The neutralizer tanks are being worked on, mixers being installed etc. 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Pipe supports for the tanks and drilling for anchors - SUEZ continues with there testing 4 Daniel Ford No 90-CHEMICAL FACILITY - Fabricate and install the 1 1/2 inch cs lines in this area - Piping continues to be installed in this area. - We are working on the supports - Eye wash stations are being installed - We are installing the copper lines 5 Daniel Ford No 96-MAINTENANCE BUILDING - Punch list - Concrete items are being worked on today 6 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank -Water is being pumped out of the north and south tanks   FBV Morro Bay Joint Venture Page 1 of 9 Printed on 1/24/2023 at 10:43 AM PST          NOTES LOG    No.Created By Issue?Location Comments   7 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - We were working on the anchors for the Conveyor today - Pickling of all welds for the conveyor is happening today 8 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - The grating for over the mixing chimney arrived today. we had to do some modifications for it to fit correctly. 9 Daniel Ford No 60-PRODUCT WATER AREA>61-Product Water Area - Calcite Contactor - We moved the 2 in ch chemical lines to line up with the injection ports in this area   MANPOWER LOG 19 Workers  |   148.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Daniel Waddle Manny Hernandez Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER APPRENTICE Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE     FBV Morro Bay Joint Venture Page 2 of 9 Printed on 1/24/2023 at 10:43 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Rafael Alvarado Created By:  Daniel Ford  5 J.R. Filanc Construction Company, Inc.2 6.0 12.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    11 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland      19  148.0    Manpower Log's Attachments:  11.  ELECTRICRAFT, INC.    FBV Morro Bay Joint Venture Page 3 of 9 Printed on 1/24/2023 at 10:43 AM PST          4-27-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   7 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   8 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 10:20AM   Burt Industrial 471-280    Comments:Created By: Monica Weiss 2 10:20AM   Ferguson Enterprises, LLC 1" CPVC    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 9 Printed on 1/24/2023 at 10:43 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   3 10:20AM   Ferguson Enterprises, LLC Wax Tape    Comments:Created By: Monica Weiss 4 10:20AM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-277 A90    Comments:Created By: Monica Weiss 5 10:20AM   HARRINGTON INDUSTRIAL PLASTICS LLC 477-286 A90    Comments:Created By: Monica Weiss 6 10:20AM   HARRINGTON INDUSTRIAL PLASTICS LLC MR145    Comments:Created By: Monica Weiss 7 10:20AM   McMaster-CARR A90 Bulkhead    Comments:Created By: Monica Weiss 8 10:20AM   Suez Water Technologies & Solutions Burkert Pnue Valve    Comments:Created By: Monica Weiss 9 10:20AM   HD Supply White Cap 46939596 Safety    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.04.27 Burt Ind 471-280.pdf   FBV Morro Bay Joint Venture Page 5 of 9 Printed on 1/24/2023 at 10:43 AM PST        2.  2022.04.27 Ferguson 1in CPVC.pdf 3.  2022.04.27 Ferguson Trenton Wax Tape.pdf 4.  2022.04.27 Harrington 471-277 A90.pdf   FBV Morro Bay Joint Venture Page 6 of 9 Printed on 1/24/2023 at 10:43 AM PST        5.  2022.04.27 Harrington 471-286 A90.pdf 6.  2022.04.27 Harrington MR145.pdf 7.  2022.04.27 McMaster Carr Bulkhead A90.pdf   FBV Morro Bay Joint Venture Page 7 of 9 Printed on 1/24/2023 at 10:43 AM PST        8.  2022.04.27 Suez Burkert Pnu Valve.pdf 9.  2022.04.27 White Cap 46939596 SAFETY.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 44°F 55°F 50°F 0.00 in.0.00 in.0.00 in.70%83%95%45°F 6.8 mph 11 mph 21 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   46°F Clear   52°F Partly Cloudy   55°F Partly Cloudy   56°F Clear   54°F Partly Cloudy   50°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No     FBV Morro Bay Joint Venture Page 8 of 9 Printed on 1/24/2023 at 10:43 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 9 of 9 Printed on 1/24/2023 at 10:43 AM PST