HomeMy WebLinkAbout2022-04-29FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 4/29/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Thu May 5, 2022 at 02:22pmPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - We placed 15 yards of slurry across the road in the front for the gas line. (We have traffic control setup as well as steel plates) - Jobsite clean up - landscaping sub grade continues - The Cement Masons are Placing concrete in the vacor pad and a small pad on the SE corner of the MBNR slab - We discovered a leak in one of the lines. We are going to dig it up and make the repair - We are working on the ravine area 2 Daniel Ford No 50-RO/UV BUILDING - This whole building has been cleaned and organized - Welding the chem line for this building - The neutralizer tanks are being worked on, mixers being installed etc. - The chem piping is being welded in this area 3 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - SUEZ continues with there testing - pickling of welds is happening in this area 4 Daniel Ford No 90-CHEMICAL FACILITY - Piping continues to be installed in this area. - We are working on the supports - We are installing the copper lines 5 Daniel Ford No 96-MAINTENANCE BUILDING - Punch list - Concrete items are being worked on today 6 Daniel Ford No 70-RESIDUALS AREA>71- Residuals Area - Sludge Holding Tanks & SAFE Settle Tank - Water is being pumped out of the north and south tanks - We cleaned out the middle tank   FBV Morro Bay Joint Venture Page 1 of 9 Printed on 1/24/2023 at 10:44 AM PST          NOTES LOG    No.Created By Issue?Location Comments   7 Daniel Ford No 70-RESIDUALS AREA>72- Residuals Area - Dewatering Facility - We were working on the anchors for the Conveyor today - Pickling of all welds for the conveyor is happening today 8 Daniel Ford No 60-PRODUCT WATER AREA>61-Product Water Area - Calcite Contactor - We cleaned the pumps in this area - We moved 3 chemical injection lines and backfiled them - The drain on the northside had to be lowered before asphalt is laid down we dug it up and lowered it a few inches.   MANPOWER LOG 19 Workers  |   148.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.4 8.0 32.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Charlie Gonzales Angel Diaz Daniel Waddle Manny Hernandez Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:LABORER APPRENTICE Javier Trevino Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE Rafael Alvarado     FBV Morro Bay Joint Venture Page 2 of 9 Printed on 1/24/2023 at 10:44 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  5 J.R. Filanc Construction Company, Inc.2 6.0 12.0 00-GENERAL     Notes:Operator Trevor Hernandez Kyle Brooking Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Cement Masons Adolfo Campoverde Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    11 ELECTRICRAFT, INC.5 8.0 40.0     Notes:Created By:  Rick Howland      19  148.0    Manpower Log's Attachments:  11.  ELECTRICRAFT, INC.    4-29-2022 Daily Report.xls     FBV Morro Bay Joint Venture Page 3 of 9 Printed on 1/24/2023 at 10:44 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   7 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   8 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 11:25AM   Airgas 1596 Safety Filters    Comments:Created By: Monica Weiss 2 11:25AM   Airgas 2575 Argon Blades    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 9 Printed on 1/24/2023 at 10:44 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   3 11:25AM   Airgas 2495 Pipe Wrap    Comments:Created By: Monica Weiss 4 11:25AM   CalPortland BLD 20 Concrete    Comments:Created By: Monica Weiss 5 11:25AM   CalPortland Sand Slurry    Comments:GAS Created By: Monica Weiss 6 11:25AM   Amerisafe Group Fall Protection Video    Comments:Created By: Monica Weiss 7 11:25AM   Grainger Copper Fittings    Comments:Created By: Monica Weiss 8 11:25AM   HARRINGTON INDUSTRIAL PLASTICS LLC 2in 90 LS (3)    Comments:Created By: Monica Weiss 9 11:25AM   HARRINGTON INDUSTRIAL PLASTICS LLC MR145    Comments:Created By: Monica Weiss 10 11:25AM   HD Supply White Cap 47002282 Bolts    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.04.29 Airgas 1596 Filter.pdf   FBV Morro Bay Joint Venture Page 5 of 9 Printed on 1/24/2023 at 10:44 AM PST        2.  2022.04.29 Airgas 2575 argon blades.pdf 3.  2022.04.29 Airgas Pipe wrap 2495.pdf 4.  2022.04.29 Calportland BLD 20 Concrete.pdf   FBV Morro Bay Joint Venture Page 6 of 9 Printed on 1/24/2023 at 10:44 AM PST        5.  2022.04.29 Calportland Sand Slurry Gas.pdf 6.  2022.04.29 Fall Protection Video.pdf 7.  2022.04.29 Grainger Copper.pdf   FBV Morro Bay Joint Venture Page 7 of 9 Printed on 1/24/2023 at 10:44 AM PST        8.  2022.04.29 Harrington 2in 90 LS x3.pdf 9.  2022.04.29 Harrington MR145.pdf 10.  2022.04.29 White Cap 47002282 Bolt.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 46°F 64°F 53°F 0.00 in.0.00 in.0.00 in.54%73%90%45°F 4.0 mph 9 mph 14 mph   FBV Morro Bay Joint Venture Page 8 of 9 Printed on 1/24/2023 at 10:44 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   51°F Clear   56°F Clear   55°F Clear   54°F Clear   60°F Clear   53°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 9 of 9 Printed on 1/24/2023 at 10:44 AM PST