Loading...
HomeMy WebLinkAbout2022-05-02FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 5/2/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - landscaping sub grade continues - The Cement Masons Are fixing up all surfaces in preparation for asphalt - We discovered a leak in one of the lines. We are going to dig it up and make the repair for the Prw 2 Daniel Ford No 50-RO/UV BUILDING - fad and install SS supports for the UV reactor - bolt up al over in the RO - The neutralizer tanks are being worked on, mixers being installed etc. - The chem piping is being welded in this area 3 Daniel Ford No 90-CHEMICAL FACILITY - We are installing supports - We are working on the supports - We are installing the copper lines 4 Daniel Ford No 60-PRODUCT WATER AREA>61-Product Water Area - Calcite Contactor - We stubbed up 3 chemical injection sites for the calcite contractor today   MANPOWER LOG 16 Workers  |   114.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz Manny Hernandez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 10 Printed on 1/24/2023 at 10:45 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE Rafael Alvarado Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 6.0 6.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    9 Dahl Insulation 1 8.0 8.0 00-GENERAL     Notes:Fall protection training, site specific orientation, material staging, job walk Created By:  Eric Girten      FBV Morro Bay Joint Venture Page 2 of 10 Printed on 1/24/2023 at 10:45 AM PST        No.Contact/Company Workers # Hours Man Hours Location     10 Dahl Insulation 2 2.0 4.0 00-GENERAL     Notes:Created By:  Eric Girten   11 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland      16  114.0    Manpower Log's Attachments:  10.  Dahl Insulation  0502 DAHL JHA.pdf 11.  ELECTRICRAFT, INC.    5-2-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 10 Printed on 1/24/2023 at 10:45 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 United Rental 8.0 Yes  11:25AM  00-GENERAL  Notes:loader Created By: Daniel Ford   6 United Rental Yes  10:15AM    Notes:Water truck Created By: Daniel Ford   7 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   8 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 12:05PM   Burt Industrial FREQ HOSE    Comments:Created By: Monica Weiss 2 12:05PM   Ferguson Enterprises, LLC 471-289 Yard Pipe    Comments:Created By: Monica Weiss 3 12:05PM   Ferguson Enterprises, LLC CREDIT Copper Fittings    Comments:Created By: Monica Weiss 4 12:05PM   Ferguson Enterprises, LLC Eye Wash Fittings    Comments:Created By: Monica Weiss 5 12:05PM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-296 CPVC Fittings    Comments:A90 Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 10 Printed on 1/24/2023 at 10:45 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   6 12:05PM   HARRINGTON INDUSTRIAL PLASTICS LLC MR Gaskets    Comments:Created By: Monica Weiss 7 12:05PM   MID-STATE CONCRETE PRODUCTS, LLC K-Rail    Comments:Created By: Monica Weiss 8 12:05PM   Miner's Ace Hardware 736778 Consumables    Comments:Created By: Monica Weiss 9 12:05PM   Miner's Ace Hardware 736780 Fasteners    Comments:Created By: Monica Weiss 10 12:05PM   NEGRANTI & SONS 33633    Comments:Created By: Monica Weiss 11 12:05PM   Suez Water Technologies & Solutions Compressor Pressure Switch    Comments:Created By: Monica Weiss 12 12:05PM   HD Supply White Cap 46992094 Grinder    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.05.02 Burt Ind YP Hose.pdf   FBV Morro Bay Joint Venture Page 5 of 10 Printed on 1/24/2023 at 10:45 AM PST        2.  2022.05.02 Ferguson 471-289 YP.pdf 3.  2022.05.02 Ferguson Credit Copper.pdf 4.  2022.05.02 Ferguson Eye Wash.pdf   FBV Morro Bay Joint Venture Page 6 of 10 Printed on 1/24/2023 at 10:45 AM PST        5.  2022.05.02 Harrington 471-296 A90 .pdf 6.  2022.05.02 Harrington MR Gaskets.pdf 7.  2022.05.02 Mid-State Concrete K-rail.pdf   FBV Morro Bay Joint Venture Page 7 of 10 Printed on 1/24/2023 at 10:45 AM PST        8.  2022.05.02 Miners 736778 Cons.pdf 9.  2022.05.02 Miners 736780 Fasteners.pdf 10.  2022.05.02 Negranti 33633 .pdf   FBV Morro Bay Joint Venture Page 8 of 10 Printed on 1/24/2023 at 10:45 AM PST        11.  2022.05.02 Suez Compressor Pressure Switch.pdf 12.  2022.05.02 White Cap 46992094 Grinder.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 46°F 56°F 51°F 0.00 in.0.00 in.0.00 in.74%86%96%47°F 6.7 mph 13 mph 23 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   48°F Clear   49°F Clear   56°F Clear   55°F Clear   54°F Clear   50°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:35:00 AM No     FBV Morro Bay Joint Venture Page 9 of 10 Printed on 1/24/2023 at 10:45 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 10 of 10 Printed on 1/24/2023 at 10:45 AM PST