Loading...
HomeMy WebLinkAbout2022-05-06FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 5/6/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 07:13amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - landscaping sub grade continues - The Cement Mason is fixing up all surfaces in preparation for asphalt - Pressure testing and repairing leaks for the PRW line 2 Daniel Ford No 50-RO/UV BUILDING - Anchorage for UV supports - Drain lines - RO bolt up is ongoing 3 Daniel Ford No 90-CHEMICAL FACILITY - Supports Are being installed - Fad, install, and weld the chemical piping - welds are being passivated - Welding for the CO2 4 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - Support and install for the extra hose bib in this area. -   MANPOWER LOG 13 Workers  |   104.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz Manny Hernandez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 10:54 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Orlando Cortez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    9 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland      13  104.0    Manpower Log's Attachments:    FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 10:54 AM PST        9.  ELECTRICRAFT, INC.    5-6-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 07:05AM   Airgas 2225    Comments:Created By: Monica Weiss 2 07:05AM   Miner's Ace Hardware 737280 A32 Fittings    Comments:Created By: Monica Weiss 3 07:05AM   Supplyhouse Copper Fittings A90    Comments:Created By: Monica Weiss 4 07:05AM   Supplyhouse Carbon Steel Fittings A90    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 10:54 AM PST        Delivery Log's Attachments: 1.  2022.05.06 Airgas 2225.pdf 2.  2022.05.06 Miners 737280 A32.pdf 3.  2022.05.06 Supplyhouse Copper A90.pdf   FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 10:54 AM PST        4.  2022.05.06 Supplyhouse CS fittings A90.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 47°F 65°F 54°F 0.00 in.0.00 in.0.00 in.73%93%100%51°F 4.8 mph 11 mph 16 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   49°F Clear   51°F Clear   63°F Clear   64°F Cloudy   56°F Fog   54°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 08:45:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 10:54 AM PST