HomeMy WebLinkAbout2022-05-06FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Friday 5/6/2022
Daily Log Completed
The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 07:13amPDT.
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL
- Jobsite clean up
- landscaping sub grade continues
- The Cement Mason is fixing up all surfaces in preparation for
asphalt
- Pressure testing and repairing leaks for the PRW line
2 Daniel Ford No 50-RO/UV BUILDING - Anchorage for UV supports
- Drain lines
- RO bolt up is ongoing
3 Daniel Ford No 90-CHEMICAL FACILITY - Supports Are being installed
- Fad, install, and weld the chemical piping
- welds are being passivated
- Welding for the CO2
4 Daniel Ford No 70-RESIDUALS AREA>73-
Residuals Area - SAFE Filter
System
- Support and install for the extra hose bib in this area.
-
MANPOWER LOG 13 Workers | 104.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Angel Diaz
Manny Hernandez
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 10:54 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Coy Brite
Orlando Cortez
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:CARPENTER APPRENTICE
Enrique Padilla
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
9 ELECTRICRAFT, INC.4 8.0 32.0
Notes:Created By: Rick Howland
13 104.0
Manpower Log's Attachments:
FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 10:54 AM PST
9. ELECTRICRAFT, INC.
5-6-2022 Daily Report.xls
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 Yes 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
2 AHERN RENTAL 8.0 Yes 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
3 AHERN RENTAL 8.0 Yes 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 Yes 11:25AM 00-GENERAL
Notes:Skid steer
Created By: Daniel Ford
5 AHERN RENTAL 8.0 Yes 02:10PM
Notes:35' Ariel lift
Created By: Daniel Ford
6 AHERN RENTAL 8.0 Yes 05:30AM
Notes:Mini Excavator
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 07:05AM Airgas 2225
Comments:Created By: Monica Weiss
2 07:05AM Miner's Ace Hardware 737280 A32 Fittings
Comments:Created By: Monica Weiss
3 07:05AM Supplyhouse Copper Fittings A90
Comments:Created By: Monica Weiss
4 07:05AM Supplyhouse Carbon Steel Fittings A90
Comments:Created By: Monica Weiss
FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 10:54 AM PST
Delivery Log's Attachments:
1.
2022.05.06 Airgas 2225.pdf
2.
2022.05.06 Miners 737280 A32.pdf
3.
2022.05.06 Supplyhouse Copper A90.pdf
FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 10:54 AM PST
4.
2022.05.06 Supplyhouse CS fittings A90.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
47°F 65°F 54°F 0.00 in.0.00 in.0.00 in.73%93%100%51°F 4.8 mph 11 mph 16 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
49°F
Clear
51°F
Clear
63°F
Clear
64°F
Cloudy
56°F
Fog
54°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 08:45:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 10:54 AM PST