Loading...
HomeMy WebLinkAbout2022-05-07FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Saturday 5/7/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - landscaping sub grade continues - The Cement Mason is fixing up all surfaces in preparation for asphalt - Pressure testing and repairing leaks for the PRW line 2 Daniel Ford No 90-CHEMICAL FACILITY - Supports Are being installed - Fad, install, and weld the chemical piping - Pressure switches for the Air tank are being installed - The auto drain for the air tank relief valve is being installed - 3 Daniel Ford No 70-RESIDUALS AREA>73- Residuals Area - SAFE Filter System - Support and install for the extra hose bib in this area. - 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Holles for supports are being drilled - Remove and Replace the 12" Butterfly valve on the east RO feed tank (shave PVC) - All thread for the cassette tank is being cut   MANPOWER LOG 9 Workers  |   72.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Daniel Ford   2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Orlando Cortez     FBV Morro Bay Joint Venture Page 1 of 3 Printed on 1/24/2023 at 10:54 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Rick Jenne Created By:  Daniel Ford  3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford       9  72.0    Manpower Log's Attachments:    EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford       FBV Morro Bay Joint Venture Page 2 of 3 Printed on 1/24/2023 at 10:54 AM PST        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 57°F 53°F 0.00 in.0.00 in.0.00 in.73%85%99%49°F 7.5 mph 16 mph 25 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   50°F Clear   53°F Clear   57°F Clear   57°F Clear   56°F Clear   53°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:15:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 3 of 3 Printed on 1/24/2023 at 10:54 AM PST