HomeMy WebLinkAbout2022-05-09FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Monday 5/9/2022
Daily Log Completed
The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 07:20amPDT.
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - The Cement Mason is fixing up all surfaces in preparation for
asphalt
- Pressure testing and repairing leaks for the PRW line
- repairs are being made to the PRW line
2 Daniel Ford No 50-RO/UV BUILDING - Anchorage for UV supports
- Drain lines
- RO bolt up is ongoing
3 Daniel Ford No 90-CHEMICAL FACILITY - Supports Are being installed
- Fad, install, and weld the chemical piping
- welds are being passivated
- Welding for the CO2 and install area happening
MANPOWER LOG 14 Workers | 116.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Angel Diaz
Manny Hernandez
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Coy Brite
Orlando Cortez
FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:54 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL
Notes:CARPENTER APPRENTICE
Enrique Padilla
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
9 Dahl Insulation 1 8.0 8.0 30-TREATMENT
AREA
Notes:Metal jacket blower piping
Created By: Eric Girten
10 ELECTRICRAFT, INC.4 8.0 32.0
Notes:Created By: Rick Howland
FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:54 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
11 Parada Painting Inc.2 10.0 20.0 30-TREATMENT
AREA>33-Treatment
Area - RO Feed
Tanks
Notes:Created By: Monica Weiss
14 116.0
Manpower Log's Attachments:
9. Dahl Insulation
0509 DAHL STA.pdf
10. ELECTRICRAFT, INC.
5-9-2022 Daily Report.xls
11. Parada Painting Inc.
0509 PARADA STA.pdf
FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:54 AM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 Yes 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
2 AHERN RENTAL 8.0 Yes 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
3 AHERN RENTAL 8.0 Yes 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 Yes 11:25AM 00-GENERAL
Notes:Skid steer
Created By: Daniel Ford
5 AHERN RENTAL 8.0 Yes 02:10PM
Notes:35' Ariel lift
Created By: Daniel Ford
6 AHERN RENTAL 8.0 Yes 05:30AM
Notes:Mini Excavator
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 07:10AM Airgas 1287
Comments:Created By: Monica Weiss
2 07:10AM Airgas 6227
Comments:Created By: Monica Weiss
3 07:10AM CAPITAL FLOW INC 471-300
Comments:Created By: Monica Weiss
4 07:10AM Fastenal 0907
Comments:Created By: Monica Weiss
5 07:10AM Suez Water Technologies &
Solutions
Condor Floats
Comments:Created By: Monica Weiss
FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:54 AM PST
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
6 07:10AM Supplyhouse Die Electric Union
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.05.09 Airgas 1287 .pdf
2.
2022.05.09 Airgas 6227.pdf
FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:54 AM PST
3.
2022.05.09 Capflo 471-300.pdf
4.
2022.05.09 Fastenal 0907.pdf
5.
2022.05.09 SUEZ Condor Floats.pdf
FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:54 AM PST
6.
2022.05.09 Supplyhouse Die-electric Union .pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
47°F 55°F 51°F 0.00 in.0.00 in.0.00 in.56%63%78%39°F 8.6 mph 15 mph 22 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
48°F
Clear
53°F
Clear
54°F
Clear
55°F
Clear
54°F
Clear
50°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 06:10:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:54 AM PST