Loading...
HomeMy WebLinkAbout2022-05-09FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 5/9/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 07:20amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - The Cement Mason is fixing up all surfaces in preparation for asphalt - Pressure testing and repairing leaks for the PRW line - repairs are being made to the PRW line 2 Daniel Ford No 50-RO/UV BUILDING - Anchorage for UV supports - Drain lines - RO bolt up is ongoing 3 Daniel Ford No 90-CHEMICAL FACILITY - Supports Are being installed - Fad, install, and weld the chemical piping - welds are being passivated - Welding for the CO2 and install area happening   MANPOWER LOG 14 Workers  |   116.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz Manny Hernandez Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Orlando Cortez     FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:54 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  3 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.0 8.0 0.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    9 Dahl Insulation 1 8.0 8.0 30-TREATMENT AREA     Notes:Metal jacket blower piping Created By:  Eric Girten    10 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland     FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:54 AM PST        No.Contact/Company Workers # Hours Man Hours Location     11 Parada Painting Inc.2 10.0 20.0 30-TREATMENT AREA>33-Treatment Area - RO Feed Tanks     Notes:Created By:  Monica Weiss      14  116.0    Manpower Log's Attachments:  9.  Dahl Insulation  0509 DAHL STA.pdf 10.  ELECTRICRAFT, INC.    5-9-2022 Daily Report.xls   11.  Parada Painting Inc.  0509 PARADA STA.pdf   FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:54 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 07:10AM   Airgas 1287    Comments:Created By: Monica Weiss 2 07:10AM   Airgas 6227    Comments:Created By: Monica Weiss 3 07:10AM   CAPITAL FLOW INC 471-300    Comments:Created By: Monica Weiss 4 07:10AM   Fastenal 0907    Comments:Created By: Monica Weiss 5 07:10AM   Suez Water Technologies & Solutions Condor Floats    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:54 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   6 07:10AM   Supplyhouse Die Electric Union    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.05.09 Airgas 1287 .pdf 2.  2022.05.09 Airgas 6227.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:54 AM PST        3.  2022.05.09 Capflo 471-300.pdf 4.  2022.05.09 Fastenal 0907.pdf 5.  2022.05.09 SUEZ Condor Floats.pdf   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:54 AM PST        6.  2022.05.09 Supplyhouse Die-electric Union .pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 47°F 55°F 51°F 0.00 in.0.00 in.0.00 in.56%63%78%39°F 8.6 mph 15 mph 22 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   48°F Clear   53°F Clear   54°F Clear   55°F Clear   54°F Clear   50°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:10:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:54 AM PST