Loading...
HomeMy WebLinkAbout2022-05-10FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 5/10/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 07:25amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - The Cement Mason is fixing up all surfaces in preparation for asphalt - Pressure testing and repairing leaks for the PRW line - Repairs are being made to the PRW and PW line. - Mowing the weeds down 2 Daniel Ford No 50-RO/UV BUILDING - Anchorage for UV supports - Drain lines - RO bolt up is ongoing 3 Daniel Ford No 90-CHEMICAL FACILITY - Supports are being installed - Fad, install, and weld the chemical piping - welds are being passivated - Welding for the C20 and install area happening 4 Daniel Ford No 20-HEADWORKS AREA>24- Headworks Area - Vactor Washdown - We are sacking and patching the walls, channel, and the area for the grating   MANPOWER LOG 14 Workers  |   112.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz Manny Hernandez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:55 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Orlando Cortez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    9 Dahl Insulation 1 8.0 8.0 30-TREATMENT AREA     Notes:Insulate/metal jacket blower piping Created By:  Eric Girten      FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:55 AM PST        No.Contact/Company Workers # Hours Man Hours Location     10 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland      14  112.0    Manpower Log's Attachments:  9.  Dahl Insulation  0510 DAHL STA.pdf 10.  ELECTRICRAFT, INC.    5-10-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:55 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   5 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 07:20AM   CAPITAL FLOW INC CS Valve    Comments:Created By: Monica Weiss 2 07:20AM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-296.1    Comments:Created By: Monica Weiss 3 07:20AM   JB DEWAR, INC Fuel    Comments:Created By: Monica Weiss 4 07:20AM   Lutz Jesco Injection Quills    Comments:Created By: Monica Weiss 5 07:20AM   Miner's Ace Hardware 737517    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.05.10 Capflo CS Valve.pdf   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:55 AM PST        2.  2022.05.10 Harrington 471-296.1.pdf 3.  2022.05.10 JB Dewar.pdf 4.  2022.05.10 Luts-Jesco Injection Quills.pdf   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:55 AM PST        5.  2022.05.10 Miners 737517.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 46°F 55°F 50°F 0.00 in.0.00 in.0.00 in.49%67%76%40°F 9.0 mph 17 mph 27 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   48°F Clear   55°F Clear   54°F Clear   55°F Clear   53°F Clear   51°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:55:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:55 AM PST