HomeMy WebLinkAbout2022-05-10FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Tuesday 5/10/2022
Daily Log Completed
The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 07:25amPDT.
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - The Cement Mason is fixing up all surfaces in preparation for
asphalt
- Pressure testing and repairing leaks for the PRW line
- Repairs are being made to the PRW and PW line.
- Mowing the weeds down
2 Daniel Ford No 50-RO/UV BUILDING - Anchorage for UV supports
- Drain lines
- RO bolt up is ongoing
3 Daniel Ford No 90-CHEMICAL FACILITY - Supports are being installed
- Fad, install, and weld the chemical piping
- welds are being passivated
- Welding for the C20 and install area happening
4 Daniel Ford No 20-HEADWORKS AREA>24-
Headworks Area - Vactor
Washdown
- We are sacking and patching the walls, channel, and the area
for the grating
MANPOWER LOG 14 Workers | 112.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Angel Diaz
Manny Hernandez
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:55 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Coy Brite
Orlando Cortez
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:CARPENTER APPRENTICE
Enrique Padilla
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
9 Dahl Insulation 1 8.0 8.0 30-TREATMENT
AREA
Notes:Insulate/metal jacket blower piping
Created By: Eric Girten
FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:55 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
10 ELECTRICRAFT, INC.4 8.0 32.0
Notes:Created By: Rick Howland
14 112.0
Manpower Log's Attachments:
9. Dahl Insulation
0510 DAHL STA.pdf
10. ELECTRICRAFT, INC.
5-10-2022 Daily Report.xls
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 Yes 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
2 AHERN RENTAL 8.0 Yes 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
3 AHERN RENTAL 8.0 Yes 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 Yes 11:25AM 00-GENERAL
Notes:Skid steer
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:55 AM PST
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
5 AHERN RENTAL 8.0 Yes 02:10PM
Notes:35' Ariel lift
Created By: Daniel Ford
6 AHERN RENTAL 8.0 Yes 05:30AM
Notes:Mini Excavator
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 07:20AM CAPITAL FLOW INC CS Valve
Comments:Created By: Monica Weiss
2 07:20AM HARRINGTON INDUSTRIAL
PLASTICS LLC
471-296.1
Comments:Created By: Monica Weiss
3 07:20AM JB DEWAR, INC Fuel
Comments:Created By: Monica Weiss
4 07:20AM Lutz Jesco Injection Quills
Comments:Created By: Monica Weiss
5 07:20AM Miner's Ace Hardware 737517
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.05.10 Capflo CS Valve.pdf
FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:55 AM PST
2.
2022.05.10 Harrington 471-296.1.pdf
3.
2022.05.10 JB Dewar.pdf
4.
2022.05.10 Luts-Jesco Injection Quills.pdf
FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:55 AM PST
5.
2022.05.10 Miners 737517.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
46°F 55°F 50°F 0.00 in.0.00 in.0.00 in.49%67%76%40°F 9.0 mph 17 mph 27 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
48°F
Clear
55°F
Clear
54°F
Clear
55°F
Clear
53°F
Clear
51°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 05:55:00 AM No
By Date Copies To
FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:55 AM PST