Loading...
HomeMy WebLinkAbout2022-05-11FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 5/11/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 09:01amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - The Cement Mason is bushing down the concrete in the outside storage buildings where the concrete is to high for the asphalt. - Repairs are being made to the PRW and PW line. - Mowing the weeds down 2 Daniel Ford No 50-RO/UV BUILDING - Anchorage for UV supports - Drain lines - RO bolt up is ongoing 3 Daniel Ford No 90-CHEMICAL FACILITY - Supports are being installed - Fad, install, and weld the chemical piping - welds are being passivated - Welding for the C20 and install area happening 4 Daniel Ford No 20-HEADWORKS AREA>22- Headworks Area - Fine Screens - Valves for the WWs Line were rotated today 5 Daniel Ford No 10-SITE OVERALL - We performed maintenance by running water through the entire safe filter system and cycling water over the entire jobsite   MANPOWER LOG 16 Workers  |   132.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Dahl Insulation 1 8.0 8.0 30-TREATMENT AREA     Notes:Insulate/metal jacket blower piping Created By:  Eric Girten      FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:55 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz Manny Hernandez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Orlando Cortez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:55 AM PST        No.Contact/Company Workers # Hours Man Hours Location     10 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland   11 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss      16  132.0    Manpower Log's Attachments:  1.  Dahl Insulation  0511 DAHL STA.pdf 10.  ELECTRICRAFT, INC.    5-11-2022 Daily Report.xls   11.  Parada Painting Inc.  0511 PARADA STA.pdf   FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:55 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 07:25AM   USA BLUEBOOK colorimeter    Comments:Created By: Monica Weiss 2 07:25AM   McMaster-CARR Sample Pump    Comments:Created By: Monica Weiss 3 07:25AM   THE HOME DEPOT DRYWALL OPS    Comments:Created By: Monica Weiss 4 07:25AM   Ferguson Enterprises, LLC Check Valve    Comments:Created By: Monica Weiss 5 07:25AM   CAPITAL FLOW INC Hydrant Bolts    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:55 AM PST        Delivery Log's Attachments: 1.  2022.05.11 USA Bluebook Colorimeter.pdf 2.  2022.05.11 Mcmaster Carr Sample pump.pdf 3.  2022.05.11 Home Depot Drywall.pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:55 AM PST        4.  2022.05.11 Ferguson Check Valve Bonney.pdf 5.  2022.05.11 Capflo Hydrant Bolts.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 44°F 55°F 50°F 0.00 in.0.00 in.0.00 in.51%68%81%40°F 7.6 mph 14 mph 21 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   46°F Clear   52°F Clear   54°F Clear   55°F Clear   54°F Clear   51°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:35:00 AM No     FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:55 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:55 AM PST