Loading...
HomeMy WebLinkAbout2022-05-12FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 5/12/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 09:31amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - The Cement Mason is bushing down the concrete in the outside storage buildings where the concrete is to high for the asphalt. - Repairs are being made to the PRW and PW line. - Mowing the weeds down 2 Daniel Ford No 50-RO/UV BUILDING - Anchorage for UV supports - Drain lines - RO bolt up is ongoing 3 Daniel Ford No 90-CHEMICAL FACILITY - Copper supports are being installed - Fad, install, and weld the chemical piping - welds are being passivated - Welding for the C20 and install area happening 4 Daniel Ford No 10-SITE OVERALL - We performed maintenance by running water through the entire safe filter system and cycling water over the entire jobsite 5 Daniel Ford No 60-PRODUCT WATER AREA - Maintenance was performed on all outfall and IPR pumps   MANPOWER LOG 12 Workers  |   100.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz Manny Hernandez Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:55 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Orlando Cortez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:CARPENTER APPRENTICE Enrique Padilla Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    9 Dahl Insulation 1 8.0 8.0 30-TREATMENT AREA     Notes:Metal jacket insulated compressed air lines Created By:  Eric Girten      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:55 AM PST        No.Contact/Company Workers # Hours Man Hours Location     10 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss      12  100.0    Manpower Log's Attachments:  9.  Dahl Insulation  0512 DAHL STA.pdf 10.  Parada Painting Inc.  0512 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift   FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:55 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   5 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 09:00AM   Ferguson Enterprises, LLC 471-301    Comments:Created By: Monica Weiss 2 09:00AM   Ferguson Enterprises, LLC Repair Coupling    Comments:Created By: Monica Weiss 3 09:00AM   Miner's Ace Hardware 737676 Glue    Comments:Created By: Monica Weiss 4 09:00AM   NEGRANTI & SONS 33608 Rip Rap    Comments:Created By: Monica Weiss 5 09:00AM   TRI STAR INDUSTRIAL LLC 2693.015 Pipe Supports    Comments:Created By: Monica Weiss 6 09:00AM   Trojan Technologies Start-up Binder    Comments:Created By: Monica Weiss 7 09:00AM   HD Supply White Cap 47191700 Safety Items    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:55 AM PST        Delivery Log's Attachments: 1.  2022.05.12 Ferguson 471-301.pdf 2.  2022.05.12 Ferguson Repair Coupling.pdf 3.  2022.05.12 Miners 737676 glue .pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:55 AM PST        4.  2022.05.12 Negranti 33608.pdf 5.  2022.05.12 Tri-Star 2693.015.pdf 6.  2022.05.12 Trojan Start-up Binder.pdf   FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:55 AM PST        7.  2022.05.12 White Cap 47191700 Safety.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 46°F 60°F 52°F 0.00 in.0.00 in.0.00 in.48%71%91%43°F 4.7 mph 9 mph 14 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   49°F Partly Cloudy   56°F Cloudy   54°F Clear   55°F Clear   59°F Clear   52°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:45:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:55 AM PST