HomeMy WebLinkAbout2022-05-13FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Friday 5/13/2022
Daily Log Completed
The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 12:54pmPDT.
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - The Cement Mason is bushing down the concrete in the
outside storage buildings where the concrete is to high for the
asphalt.
- Repairs are being made to the PRW and PW line.
- Mowing the weeds down
2 Daniel Ford No 50-RO/UV BUILDING - Anchorage for UV supports
- Drain lines
- RO bolt up is ongoing
3 Daniel Ford No 90-CHEMICAL FACILITY - Copper supports are being installed
- Fad, install, and weld the chemical piping
- welds are being passivated
- Welding for the C20 and install area happening
4 Daniel Ford No 10-SITE OVERALL - We performed maintenance by running water through the
entire safe filter system and cycling water over the entire
jobsite
5 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- Cutting in the checks for the air filter in the SS lines
- We moved the air filter and cut in T for the SS lines
- The SS supports for the filtrate support on the 8 inch filtrate
line was installed
-
FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:56 AM PST
MANPOWER LOG 12 Workers | 96.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Angel Diaz
Manny Hernandez
Jaren Unfried
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Coy Brite
Orlando Cortez
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.0 8.0 0.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:56 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
8 ELECTRICRAFT, INC.3 8.0 24.0
Notes:Created By: Rick Howland
12 96.0
Manpower Log's Attachments:
8. ELECTRICRAFT, INC.
5-13-2022 Daily Report.xls
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 Yes 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
2 AHERN RENTAL 8.0 Yes 05:40AM
Notes:45' ariel lift
Created By: Daniel Ford
3 AHERN RENTAL 8.0 Yes 02:00PM 00-GENERAL
Notes:Telescoping Forklift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 Yes 11:25AM 00-GENERAL
Notes:Skid steer
Created By: Daniel Ford
5 AHERN RENTAL 8.0 Yes 02:10PM
Notes:35' Ariel lift
Created By: Daniel Ford
6 AHERN RENTAL 8.0 Yes 05:30AM
Notes:Mini Excavator
Created By: Daniel Ford
FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:56 AM PST
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 09:30AM Burt Ind 471-309 A90 Carbon Steel
Comments:Created By: Monica Weiss
2 09:30AM Burt Ind 471-309 107573
Comments:Created By: Monica Weiss
3 09:30AM NEGRANTI & SONS 33662 Rip Rap
Comments:Created By: Monica Weiss
4 09:30AM SAFETRITE Safety DAVIT
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.05.13 Burt Ind 471-309.pdf
2.
2022.05.13 Burt Ind 471-309 107573.pdf
FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:56 AM PST
3.
2022.05.13 Negranti 33662.pdf
4.
2022.05.13 Safetrite DAVIT.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
48°F 76°F 61°F 0.00 in.0.00 in.0.00 in.27%57%89%44°F 4.6 mph 10 mph 15 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
55°F
Clear
63°F
Clear
77°F
Clear
71°F
Clear
63°F
Clear
58°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 08:05:00 AM No
FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:56 AM PST
By Date Copies To
FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:56 AM PST