Loading...
HomeMy WebLinkAbout2022-05-16FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Monday 5/16/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 01:27pmPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - we are cutting the v ditch and pulling the fence back to make room for the curb just south of pond 2 - Material is being moved for the rip rap at pond 2 - Valve cans are being installed in various places around the job and prep for asphalt is ongoing. - Pond 2 is being backfilled - All roads are being prepped for Granite - Layout for curbs down the entire front entrance 2 Daniel Ford No 50-RO/UV BUILDING - the Reps for the RO and UV systems are on site. 3 Daniel Ford No 90-CHEMICAL FACILITY - Copper pipe is being run and supported 4 Daniel Ford No 10-SITE OVERALL - Scheduled maintenance is ongoing 5 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The level sensors for the Cassette tank are being installed - Pipe supports for the MBR slab are being welded   MANPOWER LOG 15 Workers  |   120.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz Manny Hernandez Jaren Unfried Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 10:57 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    9 Dahl Insulation 1 8.0 8.0 30-TREATMENT AREA     Notes:Insulate blower pipe at MBR tank. Created By:  Eric Girten      FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 10:57 AM PST        No.Contact/Company Workers # Hours Man Hours Location     10 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland      15  120.0    Manpower Log's Attachments:  9.  Dahl Insulation  0516 DAHL STA.pdf 10.  ELECTRICRAFT, INC.    5-16-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  05:40AM    Notes:45' ariel lift Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:00PM  00-GENERAL  Notes:Telescoping Forklift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 10:57 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   5 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   6 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 12:55PM   Burt Ind 107535 471-302.1    Comments:A90 Carbon Fittings Created By: Monica Weiss 2 12:55PM   Burt Ind 107532 471-302    Comments:A90 Carbon Fittings Created By: Monica Weiss 3 12:55PM   Burt Ind 107546 471-309    Comments:Created By: Monica Weiss 4 12:55PM   Gardner Denver Compressor Oil    Comments:Created By: Monica Weiss 5 12:55PM   HARRINGTON INDUSTRIAL PLASTICS LLC 12In FRP Clamp    Comments:Created By: Monica Weiss 6 12:55PM   TSI Controls RO/UV Reactor Analyzer Panels    Comments:Created By: Monica Weiss 7 12:55PM   USA Bluebook HACH SAMPLING Glass    Comments:Created By: Monica Weiss 8 12:55PM   HD Supply White Cap 47211446 SAFETY Dust Filter    Comments:Created By: Monica Weiss 9 12:55PM   ZORO Safety -Eye wash refills    Comments:Created By: Monica Weiss   FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 10:57 AM PST        Delivery Log's Attachments: 1.  2022.05.15 Burt Ind 471-302.1 107535.pdf 2.  2022.05.16 Burt Ind 471-302 107532.pdf 3.  2022.05.16 Burt Ind 107546 471-309.pdf   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 10:57 AM PST        4.  2022.05.16 Gadner Denver Compressor Oil.pdf 5.  2022.05.16 Harrington 12in FRP Clamp.pdf 6.  2022.05.16 TSI ROUV Reactor Analyzer Panels.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 10:57 AM PST        7.  2022.05.16 USA Bluebook Hach Sample.pdf 8.  2022.05.16 White Cap 47211446 Dust Filter Safety.pdf 9.  2022.05.16 Zoro Eye Wash.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 49°F 56°F 52°F 0.00 in.0.00 in.0.00 in.79%89%97%49°F 6.6 mph 12 mph 20 mph   FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 10:57 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   50°F Clear   51°F Clear   55°F Clear   56°F Clear   54°F Clear   51°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:10:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 10:57 AM PST