Loading...
HomeMy WebLinkAbout2022-05-17FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 5/17/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 02:30pmPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Material is being moved for the rip rap at pond 2 - Valve cans are being installed in various places around the job and prep for asphalt is ongoing. - Pond 2 is being backfilled - All roads are being prepped for Granite - Layout for curbs down the entire front entrance - As builts for all manholes, pads, valve boxes and anything else in the asphalt 2 Daniel Ford No 50-RO/UV BUILDING - The Reps for the RO and UV systems are on site. 3 Daniel Ford No 90-CHEMICAL FACILITY - Copper pipe is being run and supported 4 Daniel Ford No 10-SITE OVERALL - Scheduled maintenance is ongoing 5 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The level sensors for the Cassette tank are being installed - Pipe supports for the MBR slab are being welded   MANPOWER LOG 16 Workers  |   132.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz Manny Hernandez Jaren Unfried Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 10:58 AM PST        No.Contact/Company Workers # Hours Man Hours Location     2 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    9 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland   10 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss     FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 10:58 AM PST        No.Contact/Company Workers # Hours Man Hours Location        16  132.0    Manpower Log's Attachments:  9.  ELECTRICRAFT, INC.    5-17-2022 Daily Report.xls   10.  Parada Painting Inc.  0517 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 10:58 AM PST          DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 01:25PM   Ferguson Enterprises, LLC 4in Repair Coupling    Comments:Created By: Monica Weiss 2 01:25PM   Miner's Ace Hardware Stihl Trimmer    Comments:SWPPP Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.05.17 Ferguson 4in Repair Coupling.pdf 2.  2022.05.17 Miners Stihl Trimmer 738073 SWPPP.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 47°F 55°F 51°F 0.00 in.0.00 in.0.00 in.76%87%99%47°F 6.0 mph 11 mph 17 mph   FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 10:58 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   48°F Clear   50°F Clear   55°F Clear   55°F Clear   55°F Clear   52°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:50:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 10:58 AM PST