Loading...
HomeMy WebLinkAbout2022-05-19FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 5/19/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 02:48pmPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - All roads are being prepped for Granite - Backfilling PRW and PW lines - Hills are having the mustard plants mowed down - Work on the grading for the landscaping continues - Testing for leaks continues 2 Daniel Ford No 50-RO/UV BUILDING - The Reps for the RO and UV systems are on site. - Support and install ro/uv system 3 Daniel Ford No 90-CHEMICAL FACILITY - Copper pipe is being run and supported - Installing the level transmitter - we are welding and installing chem piping 4 Daniel Ford No 10-SITE OVERALL - Scheduled maintenance is ongoing 5 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The level sensors for the Cassette tank are being installed - Pipe supports for the MBR slab are being welded   MANPOWER LOG 17 Workers  |   140.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Dahl Insulation 1 8.0 8.0 70-RESIDUALS AREA     Notes:Finish metal jacketing on insulated blower piping. Created By:  Eric Girten    2 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland     FBV Morro Bay Joint Venture Page 1 of 6 Printed on 1/24/2023 at 10:58 AM PST        No.Contact/Company Workers # Hours Man Hours Location     3 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz Manny Hernandez Jaren Unfried Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres     FBV Morro Bay Joint Venture Page 2 of 6 Printed on 1/24/2023 at 10:58 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  11 0 8.0 0.0     Notes:Apprentice Carpenters Enrique Padilla Created By:  Daniel Ford    12 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss      17  140.0    Manpower Log's Attachments:  1.  Dahl Insulation  0519 DAHL STA.pdf 2.  ELECTRICRAFT, INC.    5-19-2022 Daily Report.xls   12.  Parada Painting Inc.  0519 PARADA STA.pdf   FBV Morro Bay Joint Venture Page 3 of 6 Printed on 1/24/2023 at 10:58 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 02:35PM   Suez Water Technologies & Solutions Gaskets Bearings    Comments:Created By: Monica Weiss 2 02:35PM   HD Supply White Cap 47273035 Drywall    Comments:Created By: Monica Weiss 3 02:35PM   ZORO U-Bolts    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 4 of 6 Printed on 1/24/2023 at 10:58 AM PST        1.  2022.05.19 SUEZ Gaskets Bearings.pdf 2.  2022.05.19 White Cap 47273035 Dryawall.pdf 3.  2022.05.19 ZORO U-bolts No Packing.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 70°F 56°F 0.00 in.0.00 in.0.00 in.55%79%98%49°F 2.9 mph 4 mph 7 mph   FBV Morro Bay Joint Venture Page 5 of 6 Printed on 1/24/2023 at 10:58 AM PST          DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   50°F Clear   54°F Clear   56°F Clear   68°F Clear   64°F Clear   56°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:20:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 6 of 6 Printed on 1/24/2023 at 10:58 AM PST