Loading...
HomeMy WebLinkAbout2022-05-20FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Friday 5/20/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 02:50pmPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - All roads are being prepped for Granite - Backfilling PRW and PW lines - Hills are having the mustard plants mowed down - Work on the grading for the landscaping continues - Testing for leaks continues 2 Daniel Ford No 50-RO/UV BUILDING - The Reps for the RO and UV systems are on site. - Support and install ro/uv system 3 Daniel Ford No 90-CHEMICAL FACILITY - Copper pipe is being run and supported - Installing the level transmitter - we are welding and installing chem piping 4 Daniel Ford No 10-SITE OVERALL - Scheduled maintenance is ongoing 5 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The level sensors for the Cassette tank are being installed - Pipe supports for the MBR slab are being welded   MANPOWER LOG 14 Workers  |   108.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.3 8.0 24.0     Notes:Created By:  Rick Howland   2 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz     FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 10:59 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Manny Hernandez Jaren Unfried Created By:  Daniel Ford  3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    10 0 8.0 0.0     Notes:Apprentice Carpenters Enrique Padilla     FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 10:59 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  11 Dahl Insulation 1 4.0 4.0 30-TREATMENT AREA     Notes:Loose ends. Move material Created By:  Eric Girten       14  108.0    Manpower Log's Attachments:  1.  ELECTRICRAFT, INC.    5-20-2022 Daily Report.xls   11.  Dahl Insulation  0520 DAHL STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 10:59 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   4 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 02:45PM   CAPITAL FLOW INC Hydrant Ext    Comments:Created By: Monica Weiss 2 02:45PM   Ferguson Enterprises, LLC 45 el SOC    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.05.20 Capflo Hydrant Ext.pdf 2.  2022.05.20 Ferguson 45 el SOC.pdf     FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 10:59 AM PST        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 49°F 63°F 55°F 0.00 in.0.00 in.0.00 in.60%73%90%46°F 3.9 mph 7 mph 11 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   49°F Clear   60°F Clear   61°F Clear   61°F Clear   57°F Clear   53°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:55:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 10:59 AM PST