HomeMy WebLinkAbout2022-05-23FBV Morro Bay Joint Venture
2999 Oak Rd. #490
Walnut Creek , California 94597
Project: 471 - Morro Bay Water Reclamation
Facility
Morro Bay , California 93442
Daily Log: Monday 5/23/2022
Daily Log Completed
The Daily Log was completed by Monica Weiss on Thu Jun 2, 2022 at 02:56pmPDT.
NOTES LOG
No.Created By Issue?Location Comments
1 Daniel Ford No 00-GENERAL - Jobsite clean up
- All roads are being prepped for Granite
- Backfilling PRW and PW lines
- Work on the grading for the landscaping continues
- Testing for leaks continues
- Valve cans are being installing
- Fence repair
- Air vacs
2 Daniel Ford No 50-RO/UV BUILDING - The Reps for the RO and UV systems are on site.
- Support and install ro/uv system
3 Daniel Ford No 90-CHEMICAL FACILITY - Copper pipe is being run and supported
- Installing the level transmitter
- we are welding and installing chem piping
- Water lines in chem building
4 Daniel Ford No 10-SITE OVERALL - Scheduled maintenance is ongoing
5 Daniel Ford No 30-TREATMENT AREA>32-
Treatment Area - MBR
System
- The level sensors for the Cassette tank are being installed
- Pipe supports for the MBR slab are being welded
MANPOWER LOG 14 Workers | 112.0 Man Hours
No.Contact/Company Workers #
Hours
Man
Hours
Location
1 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL
Notes:JOURNEYMAN LABORERS
Angel Diaz
FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 10:59 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Manny Hernandez
Jaren Unfried
Created By: Daniel Ford
2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL
Notes:JOURNEYMAN CARPENTERS
Orlando Cortez
Coy Brite
Created By: Daniel Ford
3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Operator
Trevor Hernandez
Created By: Daniel Ford
4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL
Notes:Labor Foreman
Ricardo Belmontes
Created By: Daniel Ford
5 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:General Foreman
Daniel Ford
Created By: Daniel Ford
6 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Pipe fitter
Rick Dayton
Created By: Daniel Ford
7 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Carpenter Forman
Phil Lacey
Created By: Daniel Ford
8 J.R. Filanc Construction Company, Inc.1 8.0 8.0
Notes:Apprentice Laborers
Johnathan Torres
Created By: Daniel Ford
9 0 8.0 0.0
Notes:Apprentice Carpenters
Enrique Padilla
FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 10:59 AM PST
No.Contact/Company Workers #
Hours
Man
Hours
Location
Created By: Daniel Ford
10 ELECTRICRAFT, INC.3 8.0 24.0
Notes:Created By: Rick Howland
14 112.0
Manpower Log's Attachments:
10. ELECTRICRAFT, INC.
5-23-2022 Daily Report.xls
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 United Rental 8.0 Yes 12:20PM 00-GENERAL
Notes:Scissor lift
Created By: Daniel Ford
2 AHERN RENTAL 8.0 Yes 11:25AM 00-GENERAL
Notes:Skid steer
Created By: Daniel Ford
3 AHERN RENTAL 8.0 Yes 02:10PM
Notes:35' Ariel lift
Created By: Daniel Ford
4 AHERN RENTAL 8.0 Yes 05:30AM
Notes:Mini Excavator
Created By: Daniel Ford
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
1 02:50PM Airgas 3963 Argon
Comments:Created By: Monica Weiss
2 02:50PM Airgas 7639 Safety Lens
Comments:Created By: Monica Weiss
FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 10:59 AM PST
DELIVERY LOG
No.Time Delivery From Tracking Number Contents
3 02:50PM CAPITAL FLOW INC 2 in CS Pipe
Comments:Created By: Monica Weiss
4 02:50PM Fastenal Anchors A90
Comments:Created By: Monica Weiss
5 02:50PM Ferguson Enterprises, LLC CS Ball Valve
Comments:Created By: Monica Weiss
6 02:50PM HACH ISE Sensor
Comments:Created By: Monica Weiss
7 02:50PM HD Supply White Cap 47314579 Safety
Comments:Created By: Monica Weiss
Delivery Log's Attachments:
1.
2022.05.23 Airgas 3963.pdf 2022.05.23 Airgas 3963 Argon.pdf
2.
2022.05.23 Airgas 7639 Safety Lens.pdf
FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 10:59 AM PST
3.
2022.05.23 Capflo 2in CS Pipe.pdf
4.
2022.05.23 Fastenal Anchors A90.pdf
5.
2022.05.23 Ferguson CS Ball Valve.pdf
FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 10:59 AM PST
6.
2022.05.23 HACH ISE Sensor.pdf
7.
2022.05.23 White Cap 47314579 Safety.pdf
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
47°F 58°F 53°F 0.00 in.0.00 in.0.00 in.72%83%92%48°F 4.7 mph 8 mph 13 mph
DAILY SNAPSHOT
06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM
Clear
48°F
Clear
53°F
Clear
59°F
Clear
58°F
Clear
58°F
Clear
54°F
OBSERVED WEATHER CONDITIONS
No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea
1 07:35:00 AM No
FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 10:59 AM PST
By Date Copies To
FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 10:59 AM PST