Loading...
HomeMy WebLinkAbout2022-05-24FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 5/24/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Fri Jun 3, 2022 at 07:04amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - All roads are being prepped for Granite - Backfilling PRW and PW lines - Work on the grading for the landscaping continues - Testing for leaks continues - We are working on the front entrance 2 Daniel Ford No 50-RO/UV BUILDING - The Reps for the RO and UV systems are on site. - Support and install ro/uv system 3 Daniel Ford No 90-CHEMICAL FACILITY - Copper pipe is being run and supported - Installing the level transmitter - we are welding and installing chem piping - Water lines in chem building 4 Daniel Ford No 10-SITE OVERALL - Scheduled maintenance is ongoing 5 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - The level sensors for the Cassette tank are being installed - Pipe supports for the MBR slab are being welded 6 Daniel Ford No 30-TREATMENT AREA>31- Treatment Area - BNR Basins - Cleaning and pressure washing this area 7 Daniel Ford No 20-HEADWORKS AREA - Cleaning and pressure washing this area   FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 11:00 AM PST          MANPOWER LOG 16 Workers  |   128.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz Manny Hernandez Jaren Unfried Created By:  Daniel Ford    2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Coy Brite Created By:  Daniel Ford    3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 11:00 AM PST        No.Contact/Company Workers # Hours Man Hours Location     8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    9 0 8.0 0.0     Notes:Apprentice Carpenters Enrique Padilla Created By:  Daniel Ford    10 Dahl Insulation 1 8.0 8.0 30-TREATMENT AREA     Notes:Blower piping at tank Created By:  Eric Girten    11 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland      16  128.0    Manpower Log's Attachments:  11.  ELECTRICRAFT, INC.    5-24-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator   FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 11:00 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 06:35AM   Airgas 5690 Nitrogen    Comments:Created By: Monica Weiss 2 06:35AM   Burt Ind 107915 Test Material    Comments:Created By: Monica Weiss 3 06:35AM   Ferguson Enterprises, LLC 471-TR511 Test Trees    Comments:Created By: Monica Weiss 4 06:35AM   Ferguson Enterprises, LLC Eye Wash Plumbing    Comments:Created By: Monica Weiss 5 06:35AM   Ferguson Enterprises, LLC Eye Wash Plumbing    Comments:Created By: Monica Weiss 6 06:35AM   Grainger ECI V Belt    Comments:Created By: Monica Weiss 7 06:35AM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-286.1 A90 Sweeps    Comments:Created By: Monica Weiss 8 06:35AM   PRW steel 471-318 MBR Supports    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 11:00 AM PST        1.  2022.05.24 Airgas 5690 Nitrogen.pdf 2.  2022.05.24 Burt Ind 107915 Test Material.pdf 3.  2022.05.24 Ferguson 471-TR511 Test Tree.pdf   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 11:00 AM PST        4.  2022.05.25 Ferguson Eye Wash .pdf 5.  2022.05.26 Ferguson EyeW Plumbing.pdf 6.  2022.05.26 Grainger ECI V Belt .pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 11:00 AM PST        7.  2022.05.26 Harrington 471-286.1 A90 Sweeps.pdf 8.  2022.05.26 PRW Steel 471-317 .pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 48°F 59°F 54°F 0.00 in.0.00 in.0.00 in.73%83%93%49°F 3.6 mph 6 mph 10 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   49°F Clear   55°F Clear   58°F Clear   60°F Clear   59°F Clear   56°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 06:15:00 AM No     FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 11:00 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 11:00 AM PST