Loading...
HomeMy WebLinkAbout2022-05-26FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Thursday 5/26/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Fri Jun 3, 2022 at 07:57amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - Backfilling PRW and PW lines - Work on the grading for the landscaping continues - Testing for leaks continues - We installing the mail box 2 Daniel Ford No 90-CHEMICAL FACILITY - Welding and installing chem piping - Water lines in chem building 3 Daniel Ford No 10-SITE OVERALL - Scheduled maintenance is ongoing   MANPOWER LOG 18 Workers  |   148.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Dahl Insulation 1 8.0 8.0 30-TREATMENT AREA     Notes:Metal jacket blower piping at tank. Insulate blower piping at cassette tank Created By:  Eric Girten    2 ELECTRICRAFT, INC.4 8.0 32.0     Notes:Created By:  Rick Howland   3 J.R. Filanc Construction Company, Inc.3 8.0 24.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Angel Diaz Manny Hernandez Jaren Unfried     FBV Morro Bay Joint Venture Page 1 of 7 Printed on 1/24/2023 at 11:02 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  4 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Orlando Cortez Coy Brite Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    11 0 8.0 0.0     Notes:Apprentice Carpenters Enrique Padilla Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 7 Printed on 1/24/2023 at 11:02 AM PST        No.Contact/Company Workers # Hours Man Hours Location     12 Parada Painting Inc.2 10.0 20.0     Notes:Created By:  Monica Weiss      18  148.0    Manpower Log's Attachments:  1.  Dahl Insulation  0526 DAHL STA.pdf 2.  ELECTRICRAFT, INC.    5-26-2022 Daily Report.xls   12.  Parada Painting Inc.  0526 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 7 Printed on 1/24/2023 at 11:02 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 07:20AM   Ferguson Enterprises, LLC    Comments:Created By: Monica Weiss 2 07:20AM   Ferguson Enterprises, LLC    Comments:Created By: Monica Weiss 3 07:20AM   Grainger ECI V belt    Comments:Created By: Monica Weiss 4 07:20AM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-286 A90 Sweeps    Comments:Created By: Monica Weiss 5 07:20AM   PRW Steel    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 4 of 7 Printed on 1/24/2023 at 11:02 AM PST        1.  2022.05.26 Ferguson Eye Wash PLMB.pdf 2.  2022.05.26 Ferguson EyeW Plumbing.pdf 3.  2022.05.26 Grainger ECI V Belt .pdf   FBV Morro Bay Joint Venture Page 5 of 7 Printed on 1/24/2023 at 11:02 AM PST        4.  2022.05.26 Harrington 471-286.1 A90 Sweeps.pdf 5.  2022.05.26 PRW Steel 471-317 .pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 59°F 55°F 0.01 in.0.01 in.0.01 in.82%94%100%53°F 4.0 mph 7 mph 11 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Partly Cloudy   54°F Partly Cloudy   55°F Partly Cloudy   59°F Partly Cloudy   59°F Cloudy   54°F Cloudy   53°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:40:00 AM No     FBV Morro Bay Joint Venture Page 6 of 7 Printed on 1/24/2023 at 11:02 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 7 of 7 Printed on 1/24/2023 at 11:02 AM PST