Loading...
HomeMy WebLinkAbout2022-05-31FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Tuesday 5/31/2022  Daily Log Completed  The Daily Log was completed by Monica Weiss on Fri Jun 3, 2022 at 08:37amPDT.   NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - Backfilling PRW and PW lines - Work on the grading for the landscaping continues - Testing for leaks continues 2 Daniel Ford No 90-CHEMICAL FACILITY - Welding and installing chem piping - Water lines in chem building 3 Daniel Ford No 10-SITE OVERALL - Scheduled maintenance is ongoing 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Supports at cassette tank were being fabricated and installed   MANPOWER LOG 12 Workers  |   96.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 Dahl Insulation 1 8.0 8.0 30-TREATMENT AREA     Notes:Metal jacket insulated blower piping on top of cassette tank Created By:  Eric Girten    2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS Manny Hernandez Jaren Unfried Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 1 of 8 Printed on 1/24/2023 at 11:02 AM PST        No.Contact/Company Workers # Hours Man Hours Location     3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Carpenters Enrique Padilla Created By:  Daniel Ford      FBV Morro Bay Joint Venture Page 2 of 8 Printed on 1/24/2023 at 11:02 AM PST        No.Contact/Company Workers # Hours Man Hours Location     11 Parada Painting Inc.1 8.0 8.0     Notes:Created By:  Monica Weiss      12  96.0    Manpower Log's Attachments:  1.  Dahl Insulation  0531 DAHL STA.pdf 11.  Parada Painting Inc.  0531 PARADA STA.pdf   EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer   FBV Morro Bay Joint Venture Page 3 of 8 Printed on 1/24/2023 at 11:02 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   Created By: Daniel Ford   3 AHERN RENTAL 8.0 Yes  02:10PM    Notes:35' Ariel lift Created By: Daniel Ford   4 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 08:00AM   Miner's Ace Hardware Instrument Piping    Comments:Created By: Monica Weiss 2 08:00AM   Burt Ind 471-320 A90    Comments:Created By: Monica Weiss 3 08:00AM   Burt Ind 108137 CS A90    Comments:Created By: Monica Weiss 4 08:00AM   CAPITAL FLOW INC 12832 A90 AIS    Comments:Created By: Monica Weiss 5 08:00AM   Ferguson Enterprises, LLC A90    Comments:Created By: Monica Weiss 6 08:00AM   McMaster-CARR 471-324    Comments:Created By: Monica Weiss 7 08:00AM   Miner's Ace Hardware 738740 Impact    Comments:Created By: Monica Weiss 8 08:00AM   Miner's Ace Hardware 17530 Pull Line    Comments:Created By: Monica Weiss Delivery Log's Attachments:   FBV Morro Bay Joint Venture Page 4 of 8 Printed on 1/24/2023 at 11:02 AM PST        1.  2022.05.30 Miners Inst Piping.pdf 2.  2022.05.31 Burt Ind 471-320 A90 .pdf 3.  2022.05.31 Burt Ind CS A90 108137.pdf   FBV Morro Bay Joint Venture Page 5 of 8 Printed on 1/24/2023 at 11:02 AM PST        4.  2022.05.31 Capflo 12832 A90 AIS.pdf 5.  2022.05.31 Ferguson A90.pdf 6.  2022.05.31 McMaster Carr 471-324 SSTee.pdf   FBV Morro Bay Joint Venture Page 6 of 8 Printed on 1/24/2023 at 11:02 AM PST        7.  2022.05.31 Miners Impact 738740.pdf 8.  2022.05.31 Miners Pull Line 175330.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 45°F 57°F 52°F 0.00 in.0.00 in.0.00 in.72%83%95%47°F 5.7 mph 10 mph 16 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   46°F Clear   53°F Clear   57°F Clear   58°F Clear   57°F Clear   54°F   OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 07:05:00 AM No     FBV Morro Bay Joint Venture Page 7 of 8 Printed on 1/24/2023 at 11:02 AM PST            By  Date  Copies To   FBV Morro Bay Joint Venture Page 8 of 8 Printed on 1/24/2023 at 11:02 AM PST