Loading...
HomeMy WebLinkAbout2022-06-01FBV Morro Bay Joint Venture 2999 Oak Rd. #490 Walnut Creek , California 94597 Project: 471 - Morro Bay Water Reclamation Facility  Morro Bay , California 93442 Daily Log: Wednesday 6/1/2022    NOTES LOG    No.Created By Issue?Location Comments   1 Daniel Ford No 00-GENERAL - Jobsite clean up - Backfilling PRW and PW lines - Work on the grading for the landscaping continues - Testing for leaks continues - We are cutting the concrete around the edges of the v ditch for landscapers - Leak and pipe repair continues for the PW line 2 Daniel Ford No 90-CHEMICAL FACILITY - Welding and installing chem piping - Water lines in chem building 3 Daniel Ford No 10-SITE OVERALL Maintenance/Cleaning notes - As well as the cleaning of buildings and areas -Swept Water supply storage and pressure washed -Cleaned trash from RO building - Swept and cleaned up rocks on asphalt to keep them from getting ran over. 4 Daniel Ford No 30-TREATMENT AREA>32- Treatment Area - MBR System - Supports at cassette tank were being fabricated and installed   MANPOWER LOG 19 Workers  |   152.0 Man Hours No.Contact/Company Workers # Hours Man Hours Location     1 ELECTRICRAFT, INC.6 8.0 48.0     Notes:Created By:  Daniel Ford   2 J.R. Filanc Construction Company, Inc.2 8.0 16.0 00-GENERAL     Notes:JOURNEYMAN LABORERS     FBV Morro Bay Joint Venture Page 1 of 5 Printed on 1/24/2023 at 11:03 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Manny Hernandez Jaren Unfried Created By:  Daniel Ford  3 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:JOURNEYMAN CARPENTERS Coy Brite Created By:  Daniel Ford    4 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Operator Trevor Hernandez Created By:  Daniel Ford    5 J.R. Filanc Construction Company, Inc.1 8.0 8.0 00-GENERAL     Notes:Labor Foreman Ricardo Belmontes Created By:  Daniel Ford    6 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:General Foreman Daniel Ford Created By:  Daniel Ford    7 J.R. Filanc Construction Company, Inc.0 8.0 0.0     Notes:Pipe fitter Rick Dayton Created By:  Daniel Ford    8 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Carpenter Forman Phil Lacey Created By:  Daniel Ford    9 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Laborers Johnathan Torres Created By:  Daniel Ford    10 J.R. Filanc Construction Company, Inc.1 8.0 8.0     Notes:Apprentice Carpenters Enrique Padilla     FBV Morro Bay Joint Venture Page 2 of 5 Printed on 1/24/2023 at 11:03 AM PST        No.Contact/Company Workers # Hours Man Hours Location     Created By:  Daniel Ford  11 Dahl Insulation 1 8.0 8.0 30-TREATMENT AREA     Notes:Blower pipe at cassette tank Created By:  Eric Girten    12 ELECTRICRAFT, INC.3 8.0 24.0     Notes:Created By:  Rick Howland      19  152.0    Manpower Log's Attachments:  11.  Dahl Insulation  0601 DAHL STA.pdf 12.  ELECTRICRAFT, INC.    6-1-2022 Daily Report.xls     EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 United Rental 8.0 Yes  12:20PM  00-GENERAL  Notes:Scissor lift Created By: Daniel Ford   2 AHERN RENTAL 8.0 Yes  11:25AM  00-GENERAL  Notes:Skid steer Created By: Daniel Ford     FBV Morro Bay Joint Venture Page 3 of 5 Printed on 1/24/2023 at 11:03 AM PST          EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   3 AHERN RENTAL 8.0 Yes  05:30AM    Notes:Mini Excavator Created By: Daniel Ford     DELIVERY LOG No.Time Delivery From Tracking Number Contents   1 12:00PM   HARRINGTON INDUSTRIAL PLASTICS LLC 471-296.1    Comments:Created By: Monica Weiss Delivery Log's Attachments: 1.  2022.06.01 Harrington 471-296.1.pdf   WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 50°F 59°F 55°F 0.00 in.0.00 in.0.00 in.68%78%85%48°F 4.5 mph 7 mph 12 mph   DAILY SNAPSHOT 06:00AM 09:00AM 12:00PM 03:00PM 06:00PM 09:00PM Clear   50°F Clear   56°F Clear   59°F Clear   58°F Clear   57°F Clear   54°F   FBV Morro Bay Joint Venture Page 4 of 5 Printed on 1/24/2023 at 11:03 AM PST          OBSERVED WEATHER CONDITIONS No.Time Observed Weather Delay Sky Temp Average Precipitation Wind Ground/Sea   1 05:40:00 AM No       By  Date  Copies To   FBV Morro Bay Joint Venture Page 5 of 5 Printed on 1/24/2023 at 11:03 AM PST